Jacksonville, FL / Kitchen remodel
Kitchen remodel cost in Jacksonville, FL
Remodeled kitchen $75–$250/sf; average remodel $14,600–$41,300. A new-from-scratch kitchen around $65,000 ($35,000–$95,000) is a different scope and is not this typical. $35,000 typical is the midpoint of that remodel band, rounded. Labor is often quoted as about 25% of the project.
Labor for Kitchen remodel in Jacksonville, FL is indexed to the BLS construction-and-extraction occupations mean hourly wage for Jacksonville, FL of $26.78 (May 2025), applied to the 25% labor share.
City of Jacksonville Building Inspection Division (Public Works) is the issuing office. The typical permit fee recorded from City of Jacksonville §320.409(6) Alterations, Tenant Build-Out, Converting Use, retrieved 2026-09-01, is $291. Fee model: valuation.
The national typical for this job is $150. Materials stay at the national figure while labor is wage-indexed for Jacksonville, FL.
Room area. 150 to 250 sqft is a common mid-range kitchen.
Typical all-in
$29,130
Job cost plus the recorded local permit fee at this size.
- Low
- $14,643
- Typical
- $29,130
- High
- $48,640
Breakdown
| Labor (allocated) | $7,223 |
|---|---|
| Materials (allocated) | $21,667 |
| Job subtotal | $28,890 |
| Permit | $240 |
| All-in typical | $29,130 |
Labor is adjusted for construction wages in this metro. Materials stay at the national figure. This is an estimate, not a contractor quote.
Permit fee
- Fee model
- Based on project value
- Typical fee
- $240
- Range
- $198 – $490
- Retrieved
- 2026-09-01
- Alterations BID $3.00 per $1,000 (min $112.50) — $113Included.
- Resource $0.65 + DS $1.00 + C&D $0.90 per $1,000Included.
- Plan review 67% of BID or $75 — $75Included.
- Landscape 12% of BID — $14Included.
Per $1,000: BID $3.00 (min $112.50), resource $0.65, landscape 12% of BID, DS $1.00, C&D $0.90; plan review 67% of BID or $75. $15,000=$239.63. $35,000=$290.63. $75,000=$594.0.
Cabinets-only may be exempt. Totals are the alteration building path; separate electrical/plumbing/mechanical minimums are extra. Florida 2.5% is not itemized on the COJ fee page and is not added.
City of Jacksonville §320.409(6) Alterations, Tenant Build-Out, Converting Use
Citations
- Kitchen Installation Cost [2026 Data] Retrieved Aug 12, 2026. Remodel $75–$250/sf; average remodel $14,600–$41,300; new install ~$65,000 ($35k–$95k); labor ~25%.
- City of Jacksonville §320.409(6) Alterations, Tenant Build-Out, Converting Use Retrieved Aug 31, 2026. Cabinets-only may be exempt. Totals are the alteration building path; separate electrical/plumbing/mechanical minimums are extra. Florida 2.5% is not itemized on the COJ fee page and is not added.
- BLS OEWS construction wages — Jacksonville, FL BLS OEWS construction-and-extraction mean hourly wage / national same vintage, applied to laborShare only. Not a city-specific bid survey.
Other projects in Jacksonville
Kitchen remodel in other cities
- Seattle, WA
- Charlotte, NC
- Austin, TX
- Denver, CO
- Phoenix, AZ
- Nashville, TN
- Atlanta, GA
- Portland, OR
- Minneapolis, MN
- Raleigh, NC
- Chicago, IL
- Houston, TX
- Los Angeles, CA
- Dallas, TX
- Miami, FL
- Boston, MA
- Philadelphia, PA
- San Diego, CA
- Las Vegas, NV
- Washington, DC
- San Antonio, TX
- Fort Worth, TX
- Tampa, FL
- Orlando, FL
- Columbus, OH
- Indianapolis, IN
- Sacramento, CA
- Kansas City, MO
- Detroit, MI
- San Jose, CA
- San Francisco, CA
- El Paso, TX
- Oklahoma City, OK
- Baltimore, MD
- Milwaukee, WI
- Memphis, TN
- Louisville, KY
- Albuquerque, NM
- Tucson, AZ