Building Permit Fees in Orlando, FL (2026)

City of Orlando Permitting Services Division (Economic Development Department) is the permit office for Orlando, FL. The fee schedule year is 2026.

Updated Sep 1, 2026 · Fees checked Sep 1, 2026

Permit fees by job

Building permit fees in Orlando, FL by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $127.93

Range $108.88 to $175.94

Based on project value. Project value for the formula: low $8,000, typical $12,000, high $22,000.

Full roof replacement calculation below

City of Orlando Permitting Development Fees – Residential (1 or 2 units), effective January 2026

Retrieved Sep 1, 2026

HVAC replacement

Typical $147.75

Range $113.67 to $238.64

Based on project value. Project value for the formula: low $5,000, typical $7,500, high $16,000.

Full HVAC replacement calculation below

City of Orlando residential MEC Mechanical Permit Fee, January 2026

Retrieved Sep 1, 2026

Deck

Typical $127.93

Range $108.88 to $166.28

BLD $66.24 first $1,000 + $4.41 each additional $1,000, plus 1.5% AIF (min $2), 5% concurrency, 1% trust (min $2), 3% tech. $8000=$108.88. $12000=$127.93. $19200=$166.28.

Full deck calculation below

City of Orlando residential BLD building permit fee, January 2026

Retrieved Sep 1, 2026

Kitchen remodel

Typical $238.88

Range $142.22 to $433.81

BLD $66.24 first $1,000 + $4.41 each additional $1,000, plus 1.5% AIF (min $2), 5% concurrency, 1% trust (min $2), 3% tech. $15000=$142.22. $35000=$238.88. $75000=$433.81.

Full kitchen remodel calculation below

City of Orlando residential BLD, January 2026

Retrieved Sep 1, 2026

How each fee is calculated

Roof replacement

Fee basis: Based on project value.

Project value for the formula: low $8,000, typical $12,000, high $22,000.

City of Orlando Permitting Development Fees – Residential (1 or 2 units), effective January 2026 (source retrieved Sep 1, 2026). The official typical path is the residential 1 or 2 unit BLD building permit fee: $66.24 for the first $1,000 plus $4.41 for each additional $1,000 or fraction.

The fee is based on the project valuation. A permit is required on that typical path.

The low fee is $108.88, the typical fee is $127.93, and the high fee is $175.94. The official typical project value is $12,000.

Listed assumed valuations are $8,000 low, $12,000 typical, and $22,000 high. Each valuation is an exact thousand, so no fractional thousand is added.

The BLD fee plus these surcharges are included in each listed total: Administrative Inspection Fund (AIF) 1.5% of the BLD fee (minimum $2), Operational Trust Fund 1% of the BLD fee (minimum $2), technology surcharge 3% of the BLD fee, and concurrency surcharge 5% of the building permit fee. Percent amounts other than a stated minimum are rounded to the cent.

  • Low $8,000: BLD $66.24 + $4.41 x 7 = $97.11.

AIF 1.5% of $97.11 rounds to $1.46, so the $2 minimum applies. Trust 1% of $97.11 rounds to $0.97, so the $2 minimum applies.

Technology surcharge 3% of $97.11 rounds to $2.91. Concurrency surcharge 5% of $97.11 rounds to $4.86. $97.11 + $2.00 + $2.00 + $2.91 + $4.86 = $108.88, which is the low fee of $108.88.

  • Typical $12,000: BLD $66.24 + $4.41 x 11 = $114.75.

AIF 1.5% of $114.75 rounds to $1.72, so the $2 minimum applies. Trust 1% of $114.75 rounds to $1.15, so the $2 minimum applies.

Technology surcharge 3% of $114.75 rounds to $3.44. Concurrency surcharge 5% of $114.75 rounds to $5.74. $114.75 + $2.00 + $2.00 + $3.44 + $5.74 = $127.93, which is the typical fee of $127.93.

The official extras (building permit fee $114.75, Administrative Inspection Fund $2.00, Operational Trust Fund $2.00, technology surcharge $3.44, and concurrency surcharge $5.74) are included in the typical total. They are not added again.

  • High $22,000: BLD $66.24 + $4.41 x 21 = $158.85.

AIF 1.5% of $158.85 rounds to $2.38, which is above the $2 minimum. Trust 1% of $158.85 rounds to $1.59, so the $2 minimum applies.

Technology surcharge 3% of $158.85 rounds to $4.77. Concurrency surcharge 5% of $158.85 rounds to $7.94. $158.85 + $2.38 + $2.00 + $4.77 + $7.94 = $175.94, which is the high fee of $175.94.

The $175.94 high is not added on top of the $127.93 typical. Construction cost is ICC BVD or the contract, whichever is greater; these assumed valuations are used.

This note does not invent a fee beyond the official $108.88, $127.93, and $175.94 totals.

Construction cost is ICC BVD or contract, whichever is greater; assumed valuations used. 5% concurrency surcharge is listed on the BLD sheet and is included.

City of Orlando Permitting Development Fees – Residential (1 or 2 units), effective January 2026 Retrieved Sep 1, 2026.

HVAC replacement

Fee basis: Based on project value.

Project value for the formula: low $5,000, typical $7,500, high $16,000.

City of Orlando residential MEC Mechanical Permit Fee, January 2026 (source retrieved Sep 1, 2026). The official typical path is the residential mechanical permit fee: $66.24 for the first $1,000 plus $11.03 for each additional $1,000 through $25,000, plus a technology surcharge of 3% of the mechanical permit fee.

The fee is based on the project valuation. A permit is required on that typical path.

The low fee is $113.67, the typical fee is $147.75, and the high fee is $238.64. The official typical project value is $7,500.

Listed assumed valuations are $5,000 low, $7,500 typical, and $16,000 high. HVAC uses this mechanical valuation schedule, not the residential building $4.41 table.

Percent amounts are rounded to the cent. The $5,000 and $16,000 valuations are exact thousands.

The $7,500 valuation leaves a $500 remainder, and that remainder counts as one additional $1,000, so the multiplier is 7. Administrative Inspection Fund, Operational Trust Fund, and concurrency surcharge are not on this mechanical row and are not added.

  • Low $5,000: mechanical $66.24 + $11.03 x 4 = $110.36.

Technology surcharge 3% of $110.36 rounds to $3.31. $110.36 + $3.31 = $113.67, which is the low fee of $113.67.

  • Typical $7,500: mechanical $66.24 + $11.03 x 7 = $143.45.

Technology surcharge 3% of $143.45 rounds to $4.30. $143.45 + $4.30 = $147.75, which is the typical fee of $147.75. The official extras (mechanical permit fee $143.45 and technology surcharge $4.30) are included in the typical total.

They are not added again.

  • High $16,000: mechanical $66.24 + $11.03 x 15 = $231.69.

Technology surcharge 3% of $231.69 rounds to $6.95. $231.69 + $6.95 = $238.64, which is the high fee of $238.64. The $238.64 high is not added on top of the $147.75 typical.

An electrical permit if a new circuit uses the ELE formula and is not in these totals. This note does not invent a fee beyond the official $113.67, $147.75, and $238.64 totals.

HVAC uses the mechanical valuation formula, not the building $4.41 table. Electrical extra if a new circuit (ELE formula) – not in totals.

City of Orlando residential MEC Mechanical Permit Fee, January 2026 Retrieved Sep 1, 2026.

Deck

Fee basis: Based on project value.

Project value for the formula: low $8,000, typical $12,000, high $19,200.

BLD $66.24 first $1,000 + $4.41 each additional $1,000, plus 1.5% AIF (min $2), 5% concurrency, 1% trust (min $2), 3% tech. $8,000=$108.88. $12,000=$127.93. $19,200=$166.28.

New deck is residential building work. 16×20 uses assumed $12,000 (or ICC patio valuation if higher).

City of Orlando residential BLD building permit fee, January 2026 Retrieved Sep 1, 2026.

Kitchen remodel

Fee basis: Based on project value.

Project value for the formula: low $15,000, typical $35,000, high $75,000.

BLD $66.24 first $1,000 + $4.41 each additional $1,000, plus 1.5% AIF (min $2), 5% concurrency, 1% trust (min $2), 3% tech. $15,000=$142.22. $35,000=$238.88. $75,000=$433.81.

Totals are building permit only. Cabinets-only may not need BLD. Trades extra.

City of Orlando residential BLD, January 2026 Retrieved Sep 1, 2026.

Questions about these permit fees

How much is a roof replacement permit in Orlando?

The typical permit fee is $127.93. The range is $108.88 to $175.94. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $22,000. Source: City of Orlando Permitting Development Fees – Residential (1 or 2 units), effective January 2026. Retrieved Sep 1, 2026.

How much is an HVAC replacement permit in Orlando?

The typical permit fee is $147.75. The range is $113.67 to $238.64. Fee basis: Based on project value. Project value for the formula: low $5,000, typical $7,500, high $16,000. Source: City of Orlando residential MEC Mechanical Permit Fee, January 2026. Retrieved Sep 1, 2026.

How much is a deck permit in Orlando?

The typical permit fee is $127.93. The range is $108.88 to $166.28. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $19,200. Source: City of Orlando residential BLD building permit fee, January 2026. Retrieved Sep 1, 2026.

How much is a kitchen remodel permit in Orlando?

The typical permit fee is $238.88. The range is $142.22 to $433.81. Fee basis: Based on project value. Project value for the formula: low $15,000, typical $35,000, high $75,000. Source: City of Orlando residential BLD, January 2026. Retrieved Sep 1, 2026.

Where do I apply for a building permit in Orlando?

Apply with City of Orlando Permitting Services Division (Economic Development Department). The permit portal is https://www.orlando.gov/Building-Development/Permits-Inspections.