Kitchen remodel cost in Tucson, AZ
Typical cost: $29,694 (range $14,851 to $49,448)
Typical all-in
$29,694
Job cost plus the local permit fee at this size.
- Low
- $14,851
- Typical
- $29,694
- High
- $49,448
Room area. 150 to 250 sqft is a common mid-range kitchen.
Breakdown
| Labor (allocated) | $7,223 |
|---|---|
| Materials (allocated) | $21,667 |
| Job subtotal | $28,890 |
| Permit | $804.14 |
| All-in typical | $29,694 |
Labor is adjusted for construction wages in this metro. Materials stay at the national figure. This is an estimate, not a contractor quote.
Remodeled kitchen $75 to $250/sf; average remodel $14,600 to $41,300.
A typical kitchen remodel in Tucson, AZ is about $29,694, including a permit fee of $804.14.
What we assumed
For the permit line we assumed Table 4-02.4 at the official $35,000 typical valuation (not a city-assessed value), so the typical fee is $804.14 with the valuation-table portion and digital filing included. Trade permits are separate and are not in that total. Low and high totals are in the calculation note on this page.
Typical job we price for Kitchen remodel in Tucson, AZ
- Typical scope
- 200 sf affected area
- Low scope
- 150 sf
- High scope
- 400 sf
- Project value for permit formula (typical)
- $35,000
- Project value range for permit formula
- $15,000 to $75,000
Same-footprint kitchen. The high size is a larger gut of the room.
2026 remodel $14.6k–$41.3k; high = larger gut
Typical job sizes and assumed values from our published sources. Assumed values feed the permit formula. They are not the city's assessed value.
Local context
City facts
- County
- Pima County
- Population
- 548,371
- Estimate year
- 2025
- Source
- U.S. Census Bureau Vintage 2025 city estimates (July 1, 2025)
Census and county figures. These are estimates, not a permit requirement.
Why kitchen remodel costs differ in Tucson, AZ
Labor for kitchen remodel in Tucson, AZ is adjusted for local construction wages. Materials stay at the national figure.
The official typical permit fee for kitchen remodel in Tucson, AZ is $804.14 on Table 4-02.4 at the official $35,000 typical valuation. Low and high totals for the official valuation bands are in the calculation note on this page.
Level-2 reconfiguration would use 15% of standard building valuation if no contract is provided. Dataset uses assumed contract valuation on Table 4-02.4.
Building and trade permits for Tucson, AZ run through City of Tucson Planning and Development Services Department (PDSD) under the official 2026 fee schedule. The cited schedule is City of Tucson PDSD FY27 Planning and Permitting Fee Schedule, effective July 1, 2026 (source retrieved 2026-09-01). This kitchen row uses listed Table 4-02.4 contract valuation, with the valuation-table portion and digital filing included in the totals. Trade permits are separate and are not in the building total. Peer listed typical permit fees in this cluster include Charlotte, NC $257.83, Seattle, WA $1,820.90, Denver, CO $450, Nashville, TN $292.50, Atlanta, GA $175, Austin, TX $1,499.44, Phoenix, AZ $1,106, Portland, OR $210.07, Raleigh, NC $496, Tacoma, WA $1,214, St. Louis, MO $460. We only use fees extracted from the official schedule.
Uses the city fee schedule and BLS wage data. If a fee is not published, that line stays blank.
Cost details
Cost by size
| Size | All-in typical | Permit |
|---|---|---|
| 150 sf | $22,472 | $804.14 |
| 200 sf affected area (typical) | $29,694 | $804.14 |
| 400 sf | $58,584 | $804.14 |
All-in at this size, adjusted for local wages. The permit is the city fee when the schedule lists one.
Labor vs materials
- Labor share
- 25%
- Materials share
- 75%
- Cost source
- Kitchen Installation Cost [2026 Data]
Budget around 25% of project cost for labor. Cabinets, counters, and appliances dominate.
Our labor and materials split for this estimate. It is for the local wage adjustment, not a surveyed contractor split.
What moves the price
What changes the total
- Size is the kitchen floor area. The size table lists the low, typical, and high.
- Labor for Kitchen remodel in Tucson, AZ is adjusted for local construction wages.
- The permit fee on the typical job is $804.14. The permit section on this page has the schedule detail.
Metro wage index
- Metro
- Tucson, AZ
- Metro construction mean hourly
- $26.71/hr
- Metro OEWS vintage
- May 2025
- National construction mean hourly
- $31.42/hr
- National OEWS vintage
- May 2025
- Labor wage multiplier
- 0.850× labor
- Method
- BLS OEWS construction-and-extraction mean hourly wage / national same vintage, applied to the labor share only. Not a city-specific bid survey.
- Metro source
- BLS OEWS metro release
- National source
- BLS OEWS national release
For this metro the whole job is 0.963 times the national typical, because only the labor portion is adjusted for local wages.
Compare kitchen remodel across metros
| City | All-in typical | Permit | Open |
|---|---|---|---|
| Charlotte, NC | $29,328 | $257.83 | Open |
| Seattle, WA | $34,371 | $1,821 | Open |
| Denver, CO | $30,810 | $450 | Open |
| Nashville, TN | $29,603 | $292.50 | Open |
| Atlanta, GA | $29,425 | $175 | Open |
| Austin, TX | $30,539 | $1,499 | Open |
| Phoenix, AZ | $30,626 | $1,106 | Open |
| Tucson, AZ | $29,694 | $804.14 | This page |
| Portland, OR | $32,130 | $210.07 | Open |
| Raleigh, NC | $29,596 | $496 | Open |
| Tacoma, WA | $33,764 | $1,214 | Open |
| St. Louis, MO | $31,420 | $460 | Open |
Other home projects in Tucson, AZ
| Job | All-in typical | Permit | Open |
|---|---|---|---|
| Roof replacement | $9,156 | $337.49 | Open |
| HVAC replacement | $7,382 | $218.54 | Open |
| Deck | $13,657 | $337.49 | Open |
| Kitchen remodel | $29,694 | $804.14 | This page |
Questions about this estimate
- How much does kitchen remodel cost in Tucson, AZ?
- Typical all-in is about $29,694. The official PDSD permit fee of $804.14 on Table 4-02.4 is included in the all-in. Trade permits are not in that total.
- Is a permit required for Kitchen remodel in Tucson, AZ?
- Yes. City of Tucson Planning and Development Services Department (PDSD) requires a permit for a typical Kitchen remodel in Tucson, AZ. The typical listed fee is $804.14. The official path is Table 4-02.4 contract valuation, and the valuation-table portion plus digital filing are included in the typical fee. Trade permits (plumbing fixture / electrical circuit) are separate and are not in that total.
- What is included in this Kitchen remodel estimate for Tucson, AZ?
- The estimate is labor adjusted for local wages in Tucson, AZ, plus materials at the national figure, at the typical size in the table above. The official typical permit fee of $804.14 is included in the all-in typical. That $804.14 includes the official 4-02.4 Construction Valuation Table line and digital filing. Trade permits are separate and are not in that total.
- Why might the Tucson permit fee differ from this typical figure?
- The official Tucson, AZ fee comes from City of Tucson PDSD FY27 Planning and Permitting Fee Schedule, effective July 1, 2026 (valuation). The typical path is $804.14 at the official $35,000 valuation, with the valuation-table portion and digital filing included. Trade permits are separate and are not in that total. Low and high totals are in the calculation note on this page. Verify the Table 4-02.4 path with City of Tucson Planning and Development Services Department (PDSD).
- How is the typical permit fee calculated for Kitchen remodel in Tucson, AZ?
- Listed Table 4-02.4 totals are $406.34 at $15,000, $804.14 at $35,000, and $1,297.59 at $75,000. At the typical valuation the official 4-02.4 Construction Valuation Table line is $785.60 and digital filing is $18.54. Trade permits are separate and are not in that total. Full arithmetic is in the calculation note on this page.
- What project value is this Kitchen remodel permit fee based on in Tucson, AZ?
- Project values used only for the permit formula (not your total cost): low $15,000, typical $35,000, and high $75,000. The permit totals at those values are in the calculation note on this page.
- How much does a 200 sq ft kitchen remodel cost in Tucson?
- Size on this page is kitchen room area. The typical job is 200 sq ft of affected area. The cost-by-size rows are 150 sq ft, 200 sq ft, and 400 sq ft. The calculator prices the remodel per square foot, and 200 is inside the allowed range of 80 to 500, so these figures are that same scale. At 200 sq ft in Tucson, AZ the all-in is $14,851 low, $29,694 typical, and $49,448 high. Those all-in figures add the model's rounded permit for the valuation bands on this row. The official fees are $406.34 at $15,000, $804.14 at $35,000, and $1,297.59 at $75,000. The model rounds each fee to the nearest dollar before adding it, so the all-in uses $406 on the low, $804 on the typical, and $1,298 on the high. The permit is based on project value, so it is not rescaled when the kitchen size changes, and it is not a new Table 4-02.4 fee for 200 sq ft. The other table rows are 150 sq ft at $22,472 typical and 400 sq ft at $58,584 typical.
- How much does a kitchen remodel cost per square foot in Tucson?
- Cost per square foot on this page is the all-in typical divided by the kitchen square feet on that row. The square feet are room area, and the typical row is 200 sq ft of affected area. The cost-by-size rows are 150 sq ft, 200 sq ft, and 400 sq ft. The official typical permit fee is $804.14. The cost-by-size table shows that fee on each of those rows, because this permit is based on project value and is not rescaled when the kitchen size changes. At 200 sq ft in Tucson, AZ the all-in typical is $29,694, which is $148.47 per sq ft after rounding to the nearest dollar. At 150 sq ft the all-in typical is $22,472, or $149.81 per sq ft. At 400 sq ft the all-in typical is $58,584, or $146.46 per sq ft. Those per-square-foot figures are that division of the row. They are not a separate published rate.
- Is $50,000 too much for a kitchen remodel in Tucson?
- At the model's typical 200 sq ft kitchen in Tucson, AZ, the all-in is $14,851 low, $29,694 typical, and $49,448 high. $50,000 is above that typical of $29,694. Published national kitchen prices run $75 to $250 per sq ft for a remodel, with an average remodel of $14,600 to $41,300; a new-from-scratch kitchen, a different job, runs around $65,000. $50,000 is above that $41,300 remodel high and below that $65,000 scratch-kitchen figure. Wage-indexed, the high at 200 sq ft in Tucson, AZ is $49,448. $50,000 is above that adjusted for local wages high. On the typical path the same scale first reaches $50,000 at 350 sq ft ($51,361 typical). The official permit on this row is $804.14 at a $35,000 valuation, $406.34 at $15,000, and $1,297.59 at $75,000. $50,000 sits between the official typical valuation and the official high valuation, so this row does not list a separate permit fee for a $50,000 project value. The all-in figures add the model's rounded typical permit of $804. They do not look up a new Table 4-02.4 fee at $50,000.
- Do I need a permit to remodel a kitchen in Tucson?
- On the official path, yes. City of Tucson Planning and Development Services Department (PDSD) is listed as requiring a permit for a typical kitchen remodel in Tucson, AZ, and the official typical fee is $804.14. The cited source is the City of Tucson PDSD FY27 Planning and Permitting Fee Schedule, Table 4-02.4 Construction Valuation, retrieved 2026-09-01. Alterations use assumed contract valuation on Table 4-02.4. The Level-2 15%-of-standard-building-valuation path is not used because a contract value is assumed. This is City of Tucson PDSD, not unincorporated Pima County. At the official $35,000 valuation the valuation-table portion is $785.60 and digital filing is $18.54, so $785.60 + $18.54 = $804.14. Low $15,000 is an official total of $406.34. High $75,000 is an official total of $1,297.59. Digital filing is 1% of the total fee, and on each listed band that 1% is below the $18.54 minimum, so the minimum is the digital filing line. It is already inside each total. Trade permits (plumbing fixture / electrical circuit) are separate and are not added to the building total. The official extra says $150 first + $50 each additional if filed separately. That line is not added to the building total. The official typical stays $804.14. Source: City of Tucson PDSD FY27 Planning and Permitting Fee Schedule, effective July 1, 2026 (https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/fee-schedule/fy27_fee_schedule.pdf).
- Does a same-layout cosmetic kitchen remodel pay a different permit fee than a layout change in Tucson?
- The official row does not set a same-layout cosmetic fee, and it does not record a $0 cabinet-only total. The official caveat says Level-2 reconfiguration would use 15% of standard building valuation if no contract is provided. That is the layout-change path named on this row, and only when no contract is provided. This dataset uses assumed contract valuation on Table 4-02.4, so the Level-2 15%-of-standard-building-valuation path is not used. A layout change with an assumed contract value stays on Table 4-02.4. When that listed path applies, the totals stay $406.34 at $15,000, $804.14 at $35,000, and $1,297.59 at $75,000. Trade permits (plumbing fixture / electrical circuit) are separate and are not added to the building total.
- What does a kitchen remodel permit cost at $15,000, $35,000, and $75,000 in Tucson?
- Listed assumed valuations for a kitchen remodel in Tucson, AZ are $15,000 low, $35,000 typical, and $75,000 high. The official typical project value is $35,000. Each valuation is already on a $1,000 threshold, so the schedule's round-up to the nearest fee threshold does not add another thousand. Digital filing is 1% of the total fee, minimum $18.54. On each listed band that 1% is below the minimum, so digital filing is $18.54 and is already inside each total. Low $15,000 is in the $2,000.01 to $25,000 band: 13 extra thousands, $89.45 + $22.95 x 13 = $387.80, then $387.80 + $18.54 = $406.34. Typical $35,000 is in the $25,000.01 to $50,000 band: 10 extra thousands, $617.30 + $16.83 x 10 = $785.60, then $785.60 + $18.54 = $804.14. High $75,000 is in the $50,000.01 to $100,000 band: 25 extra thousands, $1,038.05 + $9.64 x 25 = $1,279.05, then $1,279.05 + $18.54 = $1,297.59. The $387.80 and $1,279.05 figures are the valuation-table portions of those listed totals, not separate extras. The official extra on this row is the typical valuation-table portion of $785.60. Alterations use assumed contract valuation on Table 4-02.4. The Level-2 15%-of-standard-building-valuation path is not used because a contract value is assumed. Trade permits are separate and are not added to the building total. This is City of Tucson PDSD, not unincorporated Pima County.
- Why does the kitchen remodel permit fee range from $406.34 to $1,297.59 in Tucson?
- The official permit range is $406.34 to $1,297.59 because the three assumed valuations sit in three different Table 4-02.4 bands. It is not one fee with a guess on either side. Low $15,000 uses $22.95 per extra $1,000 in the $2,000.01 to $25,000 band and totals $406.34. Typical $35,000 uses $16.83 per extra $1,000 in the $25,000.01 to $50,000 band and totals $804.14. High $75,000 uses $9.64 per extra $1,000 in the $50,000.01 to $100,000 band and totals $1,297.59. Digital filing is 1% of the total fee, minimum $18.54. On each listed band that 1% is below the minimum, so digital filing stays $18.54 and does not widen the range. It is already inside each total. The spread is the valuation-table portions: $387.80 at $15,000, $785.60 at $35,000, and $1,279.05 at $75,000. Trade permits (plumbing fixture / electrical circuit) are separate and are not in this range. This is City of Tucson PDSD, not unincorporated Pima County.
Permit in Tucson
Fee schedule retrieved Sep 1, 2026
City of Tucson Planning and Development Services Department (PDSD) lists a typical permit fee of $804.14 for this Kitchen remodel in Tucson, AZ (range $406.34 – $1,297.59). Source: City of Tucson PDSD FY27 Planning and Permitting Fee Schedule, effective July 1, 2026.
Level-2 reconfiguration would use 15% of standard building valuation if no contract is provided. Dataset uses assumed contract valuation on Table 4-02.4.
Fee model
- Fee model
- Valuation-based
City of Tucson PDSD FY27 Planning and Permitting Fee Schedule, Table 4-02.4 Construction Valuation (source retrieved 2026-09-01). Alterations use assumed contract valuation on Table 4-02.4. The Level-2 15%-of-standard-building-valuation path is not used because a contract value is assumed. Band $2,000.01–$25,000: base $89.45 + $22.95 per extra $1,000 of valuation above $2,000, plus digital filing 1% of the total fee, minimum $18.54. Band $25,000.01–$50,000: base $617.30 + $16.83 per extra $1,000 of valuation above $25,000, plus digital filing 1% of the total fee, minimum $18.54. Band $50,000.01–$100,000: base $1,038.05 + $9.64 per extra $1,000 of valuation above $50,000, plus digital filing 1% of the total fee, minimum $18.54. Listed assumed valuations are $15,000 low, $35,000 typical, and $75,000 high. The official typical project value is $35,000. In calculating fees, the schedule says values are rounded up to the nearest fee threshold. $15,000, $35,000, and $75,000 are already on a $1,000 threshold, so each extra thousand is an exact count. Digital filing is 1% of the total fee, minimum $18.54. On each listed band, 1% of the total fee is below that minimum, so digital filing is the $18.54 minimum. It is already inside each total and is not added again. Low $15,000 = $406.34 total. That is 13 additional thousands: $89.45 + $22.95 x 13 = $387.80. $387.80 + $18.54 = $406.34. The $387.80 is the low valuation-table portion, not a separate extra. Typical $35,000: valuation-table portion $785.60 + digital filing $18.54 = $804.14. That line is 10 additional thousands: $617.30 + $16.83 x 10 = $785.60. $785.60 + $18.54 = $804.14. Those two lines are the typical total and are not added again on top of $804.14. High $75,000 = $1,297.59 total. That is 25 additional thousands: $1,038.05 + $9.64 x 25 = $1,279.05. $1,279.05 + $18.54 = $1,297.59. The $1,279.05 is the high valuation-table portion, not a separate extra. Trade permits (plumbing fixture / electrical circuit) are separate and are not added to the building total. City of Tucson PDSD (not unincorporated Pima County).
Official permit schedule figures. Check the city's calculator before you apply.
Fee schedule
- Schedule year
- 2026
- Official schedule
- Official fee schedule
- Cited source
- City of Tucson PDSD FY27 Planning and Permitting Fee Schedule, effective July 1, 2026
- Retrieved
- Sep 1, 2026
- Department
- City of Tucson Planning and Development Services Department (PDSD)
City permit office figures. Confirm current fees with City of Tucson Planning and Development Services Department (PDSD) before you apply.
Portal
- Department
- City of Tucson Planning and Development Services Department (PDSD)
- Apply online
- Official permit portal
City permit office figures. Confirm current requirements with City of Tucson Planning and Development Services Department (PDSD) before you apply.
Line items
| Line item | Fee |
|---|---|
| 4-02.4 Construction Valuation Table | $785.60 |
| Digital filing 1%, min $18.54 | $18.54 |
| Trade permits (plumbing fixture / electrical circuit) | Blank |
Assumed project value
| Band | Assumed project value |
|---|---|
| Low | $15,000 |
| Typical | $35,000 |
| High | $75,000 |
Process
- Does a typical Kitchen remodel in Tucson, AZ need a permit?
- A typical Kitchen remodel in Tucson, AZ is listed as requiring a permit. Level-2 reconfiguration would use 15% of standard building valuation if no contract is provided.
- Who issues the permit in Tucson, AZ, and where do I apply?
- City of Tucson Planning and Development Services Department (PDSD) issues permits for Kitchen remodel in Tucson, AZ. Apply at https://www.tucsonaz.gov/Departments/Planning-Development-Services.
- What extra fees or surcharges are listed for Kitchen remodel in Tucson, AZ?
- The official permit lists these extra line items for Kitchen remodel in Tucson, AZ: 4-02.4 Construction Valuation Table: $785.60; Digital filing 1%, min $18.54: $18.54; Trade permits (plumbing fixture / electrical circuit): not published in the fee schedule.
Schedule FAQ
- Which official schedule is this Kitchen remodel fee based on in Tucson, AZ?
- The official typical for Kitchen remodel in Tucson, AZ cites City of Tucson PDSD FY27 Planning and Permitting Fee Schedule, effective July 1, 2026 (retrieved Sep 1, 2026). Fee model: valuation.
- What local fee-schedule notes are on file for Kitchen remodel in Tucson, AZ?
- FY27 Planning and Permitting Fee Schedule effective July 1, 2026. Construction Valuation Table 4-02.4.
- Why does the Kitchen remodel permit fee in Tucson, AZ show a low-to-high range?
- Listed permit fees for Kitchen remodel in Tucson, AZ span $406.34 - $1,297.59, with a typical of $804.14. Band arithmetic is in the calculation note on this page.
Citations
- Kitchen Installation Cost [2026 Data] Retrieved Aug 13, 2026. Remodel $75–$250/sf; average remodel $14,600–$41,300; new install ~$65,000 ($35k–$95k); labor ~25%.
- City of Tucson PDSD FY27 Planning and Permitting Fee Schedule, effective July 1, 2026 Retrieved Sep 1, 2026.
- BLS OEWS construction wages – Tucson, AZ BLS OEWS construction-and-extraction mean hourly wage / national same vintage, applied to the labor share only. Not a city-specific bid survey.
Cite this page
Fee schedule retrieved Sep 1, 2026
CostInMyCity. "Kitchen remodel cost in Tucson, AZ." https://costinmycity.com/cost/kitchen-remodel/tucson-az/. Fee schedule retrieved Sep 1, 2026. Source: City of Tucson PDSD FY27 Planning and Permitting Fee Schedule, effective July 1, 2026.
City of Tucson PDSD FY27 Planning and Permitting Fee Schedule, effective July 1, 2026
Related
In Tucson
- Roof replacement in Tucson, AZ, ~$9,156
- HVAC replacement in Tucson, AZ, ~$7,382
- Deck in Tucson, AZ, ~$13,657
Related kitchens
- Kitchen remodel in Charlotte, NC, ~$29,328
- Kitchen remodel in Seattle, WA, ~$34,371
- Kitchen remodel in Denver, CO, ~$30,810
- Kitchen remodel in Nashville, TN, ~$29,603
- Kitchen remodel in Atlanta, GA, ~$29,425
- Kitchen remodel in Austin, TX, ~$30,539
- Kitchen remodel in Phoenix, AZ, ~$30,626
- Kitchen remodel in Portland, OR, ~$32,130
- Kitchen remodel in Raleigh, NC, ~$29,596
- Kitchen remodel in Tacoma, WA, ~$33,764
- Kitchen remodel in St. Louis, MO, ~$31,420