Roof replacement
Fee basis: Flat fee.
Project value on this row: low $8,000, typical $12,000, high $22,000.
City of Cape Coral Miscellaneous Permit Fee Schedule (effective January 1, 2026) (source retrieved Sep 1, 2026). The official typical path is a Roofing Miscellaneous permit.
City of Cape Coral, not Fort Myers. The fee is a flat amount.
A permit is required on that typical path. The low fee is $102.50, the typical fee is $102.50, and the high fee is $102.50.
The official typical project value is $12,000. Listed assumed valuations are $8,000 low, $12,000 typical, and $22,000 high.
Valuation is not an input on this flat path, so those amounts are unused and do not change the $102.50 / $102.50 / $102.50 listed fees. The published Roofing Miscellaneous line is $100.00.
The schedule header adds a 2.5% Florida Building Code surcharge on building-permit cost. $100.00 x 1.025 = $102.50.
- Low $8,000: valuation is unused, so the low fee stays $102.50.
Roofing Miscellaneous $100.00 plus the Florida Building Code 2.5% surcharge $2.50 equals $102.50, so the low fee is $102.50. The low uses the same roofing path as the typical.
Valuation does not change the flat fee.
- Typical $12,000: valuation is unused, so the typical fee stays $102.50.
Roofing Miscellaneous $100.00 plus the Florida Building Code 2.5% surcharge $2.50 equals $102.50, so the typical fee is $102.50. The $100.00 Roofing Miscellaneous line and the $2.50 Florida Building Code 2.5% surcharge are included in the $102.50 and are not added again.
- High $22,000: valuation is unused, so the high fee stays $102.50.
The high uses the same roofing path. Roofing Miscellaneous $100.00 plus the Florida Building Code 2.5% surcharge $2.50 equals $102.50, so the high fee is $102.50.
The $102.50 high is the same total as the $102.50 typical and is not added on top of it. No separate residential full-reroof line was printed on the January 1, 2026 miscellaneous schedule.
This note does not invent a fee beyond the official $102.50 total.
City of Cape Coral, not Fort Myers. Roofing Miscellaneous $100 is the extractable roofing line on the January 1, 2026 miscellaneous schedule. The schedule header adds a 2.5% FBC surcharge on building-permit cost. No separate residential full-reroof line was printed.
City of Cape Coral Miscellaneous Permit Fee Schedule (effective January 1, 2026) Retrieved Sep 1, 2026.