Building Permit Fees in Jacksonville, FL (2026)

City of Jacksonville Building Inspection Division (Public Works) is the permit office for Jacksonville, FL. The fee schedule year is 2026.

Updated Sep 1, 2026 · Fees checked Sep 1, 2026

Permit fees by job

Building permit fees in Jacksonville, FL by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $167.50

Based on area. Project value on this row: low $8,000, typical $12,000, high $22,000.

Full roof replacement calculation below

City of Jacksonville coj.net/fees implementing Ordinance Code §320.409(10) Roofing

Retrieved Sep 1, 2026

HVAC replacement

Typical $60

Range $60 to $94

Tiered. Project value on this row: low $5,000, typical $7,500, high $16,000.

Full HVAC replacement calculation below

City of Jacksonville Mechanical Permit Fees §320.409

Retrieved Sep 1, 2026

Deck

Typical $175

Range $125 to $175

Low one-inspection accessory: $75 (includes plan review) + DS $25 + C&D $25 = $125. Typical/high more than one inspection: BID $112.50 + DS $37.50 + C&D $25 = $175.

Full deck calculation below

City of Jacksonville §320.409(2) residential accessory-structure exceptions

Retrieved Sep 1, 2026

Kitchen remodel

Typical $290.63

Range $239.63 to $594

Per $1,000: BID $3.00 (min $112.50), resource $0.65, landscape 12% of BID, DS $1.00, C&D $0.90; plan review 67% of BID or $75. $15,000=$239.63. $35,000=$290.63. $75,000=$594.0.

Full kitchen remodel calculation below

City of Jacksonville §320.409(6) Alterations, Tenant Build-Out, Converting Use

Retrieved Sep 1, 2026

How each fee is calculated

Roof replacement

Fee basis: Based on area.

Project value on this row: low $8,000, typical $12,000, high $22,000.

City of Jacksonville coj.net/fees implementing Ordinance Code §320.409(10) Roofing (source retrieved Sep 1, 2026). The official typical path is the BID roofing inspection path on the per-1,000-sf line.

The fee is based on square footage. A permit is required on that typical path.

The low fee is $167.50, the typical fee is $167.50, and the high fee is $167.50. The official typical project value is $12,000.

Listed assumed valuations are $8,000 low, $12,000 typical, and $22,000 high. Valuation is not the fee driver on this area schedule, so those project values are unused and do not change the $167.50 / $167.50 / $167.50 listed fees.

The published BID roofing line is $10 per 1,000 sf. With an inspection, that line has a $150 minimum.

The roofing C&D debris fee is $17.50. Documented roof surfaces are 1,000 sf low, 1,500 sf typical, and 1,800 sf high.

At 1,000 / 1,500 / 1,800 sf that is 1-2 squares ($10-$20), so the $150 inspection minimum applies on all three paths. ceil(sf/1000) x $10, minimum $150 with inspection, plus $17.50 C&D equals $167.50 at 1,000 / 1,500 / 1,800 sf.

  • Low 1,000 sf: ceil(1000/1000) x $10 = $10, which is below the $150 inspection minimum, so the BID roofing minimum is $150. $150 plus the $17.50 C&D debris fee equals $167.50, which is the low fee of $167.50.

The $8,000 assumed project value is unused and does not change that fee.

  • Typical 1,500 sf: ceil(1500/1000) x $10 = $20, which is below the $150 inspection minimum, so the BID roofing minimum is $150. $150 plus the $17.50 C&D debris fee equals $167.50, which is the typical fee of $167.50.

The $12,000 assumed project value is unused and does not change that fee. The $150 BID roofing minimum and the $17.50 C&D debris fee are included in the $167.50 and are not added again.

  • High 1,800 sf: ceil(1800/1000) x $10 = $20, which is below the $150 inspection minimum, so the BID roofing minimum is $150. $150 plus the $17.50 C&D debris fee equals $167.50, which is the high fee of $167.50.

The $22,000 assumed project value is unused and does not change that fee. The $167.50 high is the same total as the $167.50 typical and is not added on top of it.

Repairs under 500 sf are $10 and are not this typical job. The F.S. 2.5% surcharge is not itemized on the COJ fee page and is not added.

This note does not invent a fee beyond the official $167.50 total.

Documented typical roof surface 1,500 sf (low 1,000 / high 1,800). All three stay on the $150 inspection minimum. Repairs <500 sf are $10 and are not this typical job. F.S. 2.5% surcharge is not itemized on the COJ fee page and is not added.

City of Jacksonville coj.net/fees implementing Ordinance Code §320.409(10) Roofing Retrieved Sep 1, 2026.

HVAC replacement

Fee basis: Tiered.

Project value on this row: low $5,000, typical $7,500, high $16,000.

City of Jacksonville Mechanical Permit Fees §320.409 (source retrieved Sep 1, 2026). The official typical path is the mechanical device schedule with the $60 mechanical minimum.

The fee follows a tiered schedule. A permit is required on that typical path.

The low fee is $60, the typical fee is $60, and the high fee is $94. The official typical project value is $7,500.

Listed assumed valuations are $5,000 low, $7,500 typical, and $16,000 high. Valuation is not the fee driver on this tiered schedule, so those project values are unused and do not change the $60 / $60 / $94 listed fees.

The published air conditioning line is $11 per ton for 1-10 tons. The furnace line is $22 for the first 200,000 BTU.

  • Typical 80 kBTU and the 60 kBTU and 120 kBTU sizes all sit in that first 200,000 BTU step.

The mechanical minimum is $60 and applies when the device lines fall under $60. The air duct systems line is $17 for the first 2,000 CFM and is used on the high path only.

  • Low 2-ton: $11 x 2 = $22, which is below the $60 mechanical minimum, so the official fee is the $60 minimum, which is the low fee of $60.

The $5,000 assumed project value is unused and does not change that fee.

  • Typical 3-ton plus furnace: air conditioning $11 x 3 = $33, plus furnace first 200,000 BTU $22, equals $55.

That sum is below the $60 mechanical minimum, so the official fee is the $60 minimum, which is the typical fee of $60. The $7,500 assumed project value is unused and does not change that fee.

The $33 air conditioning line, the $22 furnace line, and the $60 mechanical minimum are included as typical and low and are not added again. The $60 minimum replaces the $55 device sum; it is not stacked on top of $55.

  • High 5-ton plus furnace plus ducts: air conditioning $11 x 5 = $55, plus furnace first 200,000 BTU $22, plus air duct systems first 2,000 CFM $17, equals $94, which is the high fee of $94.

The $16,000 assumed project value is unused and does not change that fee. The $94 device sum is already above the $60 mechanical minimum, so the $60 minimum does not stack on top of the $94.

The $17 duct line is on the high path only and is not added to the $60 low or the $60 typical. An electrical extra is not dollarized and is not in these totals.

The Florida 2.5% surcharge is not on the COJ table and is not added. This note does not invent a fee beyond the official $60, $60, and $94 totals.

3-ton AC + 80 kBTU furnace = $33+$22=$55 → $60 minimum. High 5-ton + furnace + first 2,000 CFM ducts $55+$22+$17=$94. Electrical extra not dollarized. Florida 2.5% not on the COJ table.

City of Jacksonville Mechanical Permit Fees §320.409 Retrieved Sep 1, 2026.

Deck

Fee basis: Based on area.

Project value on this row: low $8,000, typical $12,000, high $19,200.

Low one-inspection accessory: $75 (includes plan review) + DS $25 + C&D $25 = $125. Typical/high more than one inspection: BID $112.50 + DS $37.50 + C&D $25 = $175.

320 sf exceeds the 150 sf / $5,000 one-inspection accessory path. Low uses the one-inspection accessory bundle. Typical/high use the more-than-one-inspection accessory mins. Landscape fee exempt for SFR accessory on this exception. Florida 2.5% not on the COJ table.

City of Jacksonville §320.409(2) residential accessory-structure exceptions Retrieved Sep 1, 2026.

Kitchen remodel

Fee basis: Based on project value.

Project value for the formula: low $15,000, typical $35,000, high $75,000.

Per $1,000: BID $3.00 (min $112.50), resource $0.65, landscape 12% of BID, DS $1.00, C&D $0.90; plan review 67% of BID or $75. $15,000=$239.63. $35,000=$290.63. $75,000=$594.

Cabinets-only may be exempt. Totals are the alteration building path; separate electrical/plumbing/mechanical minimums are extra. Florida 2.5% is not itemized on the COJ fee page and is not added.

City of Jacksonville §320.409(6) Alterations, Tenant Build-Out, Converting Use Retrieved Sep 1, 2026.

Questions about these permit fees

How much is a roof replacement permit in Jacksonville?

The typical permit fee is $167.50. Fee basis: Based on area. Project value on this row: low $8,000, typical $12,000, high $22,000. Source: City of Jacksonville coj.net/fees implementing Ordinance Code §320.409(10) Roofing. Retrieved Sep 1, 2026.

How much is an HVAC replacement permit in Jacksonville?

The typical permit fee is $60. The range is $60 to $94. Fee basis: Tiered. Project value on this row: low $5,000, typical $7,500, high $16,000. Source: City of Jacksonville Mechanical Permit Fees §320.409. Retrieved Sep 1, 2026.

How much is a deck permit in Jacksonville?

The typical permit fee is $175. The range is $125 to $175. Fee basis: Based on area. Project value on this row: low $8,000, typical $12,000, high $19,200. Source: City of Jacksonville §320.409(2) residential accessory-structure exceptions. Retrieved Sep 1, 2026.

How much is a kitchen remodel permit in Jacksonville?

The typical permit fee is $290.63. The range is $239.63 to $594. Fee basis: Based on project value. Project value for the formula: low $15,000, typical $35,000, high $75,000. Source: City of Jacksonville §320.409(6) Alterations, Tenant Build-Out, Converting Use. Retrieved Sep 1, 2026.

Where do I apply for a building permit in Jacksonville?

Apply with City of Jacksonville Building Inspection Division (Public Works). The permit portal is https://www.jacksonville.gov/departments/public-works/building-inspection-division.

Permit fees in other Florida cities