CostInMyCity

Oklahoma City, OK / Deck

Deck cost in Oklahoma City, OK

$30–$60 per sq ft; average job $8,316 (range $4,340–$12,652). A 16×20 (320 sf) table is $12,800–$19,200. Pressure-treated is the low end; second-story / high-end wood / custom is the high end.

Labor for Deck in Oklahoma City, OK is indexed to the BLS construction-and-extraction occupations mean hourly wage for Oklahoma City, OK of $27.27 (May 2025), applied to the 50% labor share.

Oklahoma City Development Services is the issuing office. The typical permit fee recorded from Oklahoma City Municipal Code Ch. 60 (Ord. 27,978), fees effective July 1, 2026, retrieved 2026-09-01, is $76. Fee model: valuation.

The national typical for this job is $45. Materials stay at the national figure while labor is wage-indexed for Oklahoma City, OK.

Walking surface only. A 16 by 20 deck is 320 sqft.

Typical all-in

$13,535

Job cost plus the recorded local permit fee at this size.

Low
$9,051
Typical
$13,535
High
$18,068

Breakdown

Labor (allocated)$6,725
Materials (allocated)$6,725
Job subtotal$13,450
Permit$85
All-in typical$13,535

Labor is adjusted for construction wages in this metro. Materials stay at the national figure. This is an estimate, not a contractor quote.

Permit fee

Fee model
Based on project value
Typical fee
$85
Range
$85 – $135
Retrieved
2026-09-01
  • 60-12-7 alteration/repair (or new accessory as valuation) — $75Min $75. Included.
  • 60-12-1 OUBCC collection — $1Included.

Same $6/$1,000 min $75 + $0.50 as reroof. $8,000=75.5; $12,000=75.5; $19,200=120.5.

No deck-specific line. 60-12-7 valuation applies to alterations/repair; 60-12-9 new-construction per-sf is commercial/warehouse, not used. 1-2 family plan review does not apply.

Oklahoma City Municipal Code Ch. 60 (Ord. 27,978), fees effective July 1, 2026

Citations

  1. How Much Does It Cost to Build a Deck? [2026 Data] Retrieved Aug 12, 2026. Average $8,316; $4,340–$12,652; $30–$60/sf; labor $15–$35/sf.
  2. Oklahoma City Municipal Code Ch. 60 (Ord. 27,978), fees effective July 1, 2026 Retrieved Aug 31, 2026. No deck-specific line. 60-12-7 valuation applies to alterations/repair; 60-12-9 new-construction per-sf is commercial/warehouse, not used. 1-2 family plan review does not apply.
  3. BLS OEWS construction wages — Oklahoma City, OK BLS OEWS construction-and-extraction mean hourly wage / national same vintage, applied to laborShare only. Not a city-specific bid survey.

Other projects in Oklahoma City

Deck in other cities