CostInMyCity

Portland, OR / Deck

Deck cost in Portland, OR

$30–$60 per sq ft; average job $8,316 (range $4,340–$12,652). A 16×20 (320 sf) table is $12,800–$19,200. Pressure-treated is the low end; second-story / high-end wood / custom is the high end.

Labor for Deck in Portland, OR is indexed to the BLS construction-and-extraction occupations mean hourly wage for Portland-Vancouver-Hillsboro, OR-WA of $39.44 (May 2025), applied to the 50% labor share.

Portland Permitting & Development (PP&D) is the issuing office. The typical permit fee recorded from City of Portland Building and Other Permits Fee Schedule, effective July 10, 2026, retrieved 2026-08-13, is $103. Fee model: valuation.

The national typical for this job is $45. Materials stay at the national figure while labor is wage-indexed for Portland, OR.

Walking surface only. A 16 by 20 deck is 320 sqft.

Typical all-in

$16,368

Job cost plus the recorded local permit fee at this size.

Low
$10,929
Typical
$16,368
High
$21,834

Breakdown

Labor (allocated)$8,115
Materials (allocated)$8,114
Job subtotal$16,229
Permit$139
All-in typical$16,368

Labor is adjusted for construction wages in this metro. Materials stay at the national figure. This is an estimate, not a contractor quote.

Permit fee

Fee model
Based on project value
Typical fee
$139
Range
$110 – $196
Retrieved
2026-08-13
  • Building permit (PP&D table) — $92From official July 10, 2026 Building and Other Permits Fee Schedule.
  • Oregon 12% state surcharge — $11Included. Charged on the building permit fee.
  • Plan review / development servicesAdditional valuation-based fees on the same official PDF; not extracted. Real total is higher.

Building-permit line + 12% surcharge. Plan review / development-services add-ons not extracted.

City of Portland Building and Other Permits Fee Schedule, effective July 10, 2026

Citations

  1. How Much Does It Cost to Build a Deck? [2026 Data] Retrieved Aug 12, 2026. Average $8,316; $4,340–$12,652; $30–$60/sf; labor $15–$35/sf.
  2. City of Portland Building and Other Permits Fee Schedule, effective July 10, 2026 Retrieved Aug 12, 2026. Building-permit line + 12% surcharge. Plan review / development-services add-ons not extracted.
  3. BLS OEWS construction wages — Portland-Vancouver-Hillsboro, OR-WA BLS OEWS construction-and-extraction mean hourly wage / national same vintage, applied to laborShare only. Not a city-specific bid survey.

Other projects in Portland

Deck in other cities