Roof replacement
Fee basis: Based on project value.
Project value for the formula: low $8,000, typical $12,000, high $22,000.
City of Tulsa Title 49 Ch. 3 building permit fees (Ord. 25351, July 17, 2024), retrieved Sep 1, 2026. These totals are for the City of Tulsa, not Tulsa County.
City of Tulsa Development Services (building permits) applies this schedule inside the city. For a residential roof replacement on this row, a permit is required.
The official fee band is $213 / $213 / $213. The low fee, the typical fee, and the high fee are each $213.
The official typical project value is $12,000. The project values used for this fee are $8,000 low, $12,000 typical, and $22,000 high.
Walk the typical first. The $12,000 typical job sits in the single $5,000.01 to $40,000 band, so the building permit fee is $213.
The line Building permit fee (Title 49 §302) is that same $213 building permit fee. The application fee is credited against this amount so the total equals the building permit fee, and it is not added on top.
Low and high match that same $213 because the $8,000 low job and the $22,000 high job sit in the same $5,000.01 to $40,000 band. The low fee is $213.
The high fee is $213. The $213 high is the same total as the $213 typical and is not a second charge.
Roof area is not an input to this listed permit total. Documented roof sizes, including 1,000 / 1,500 / 1,800 sf of roof surface, do not change the $213.
A larger documented roof and a smaller documented roof still produce $213 on this path. A job above $40,000 would leave this listed band, and this page does not state that next-band fee.
Chapter 1 administrative fees are required by the ordinance, but the Chapter 1 dollar table is not published in the fee schedule and not added. This page does not state a dollar amount for those Chapter 1 administrative fees.
This page does not invent plan-review add-ons. This page does not invent technology fees.
This page does not invent a fee beyond the official $213. The calculator rounds the official $213 to the nearest dollar before it adds the permit to the all-in estimate, and that rounding does not change the official fee.
City of Tulsa, not the county. Chapter 1 administrative fees are required by the ordinance but the Chapter 1 dollar table is not published in the fee schedule and is not added.
City of Tulsa Title 49 Ch. 3 building permit fees (Ord. 25351, July 17, 2024) Retrieved Sep 1, 2026.