Building Permit Fees in Tulsa, OK (2026)

City of Tulsa – Development Services / building permits is the permit office for Tulsa, OK. The fee schedule year is 2024.

Updated Sep 1, 2026 · Fees checked Sep 1, 2026

Permit fees by job

Building permit fees in Tulsa, OK by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $213

Based on project value. Project value for the formula: low $8,000, typical $12,000, high $22,000.

Full roof replacement calculation below

City of Tulsa Title 49 Ch. 3 building permit fees (Ord. 25351, July 17, 2024)

Retrieved Sep 1, 2026

HVAC replacement

Typical $82

Range $35 to $117

Typical 3-ton (36,000 BTU) like-for-like split = heating $35 + refrigeration $47 = $82. Low = heating only $35. High = $35+$47+$35 ducts = $117.

Full HVAC replacement calculation below

City of Tulsa Title 49 mechanical permit fees (Ord. 25351)

Retrieved Sep 1, 2026

Deck

Typical $213

Low/typical/high all in the $213 band. Typical-job spec 16×20 = 320 sf.

Full deck calculation below

City of Tulsa Title 49 Ch. 3 building permit fees (Ord. 25351, July 17, 2024)

Retrieved Sep 1, 2026

Kitchen remodel

Typical $213

Range $213 to $450

Low/typical $15k–$35k = $213. High $75,000 = $6 × 75 = $450.00. Typical-job spec 200 sf.

Full kitchen remodel calculation below

City of Tulsa Title 49 Ch. 3 building permit fees (Ord. 25351, July 17, 2024)

Retrieved Sep 1, 2026

How each fee is calculated

Roof replacement

Fee basis: Based on project value.

Project value for the formula: low $8,000, typical $12,000, high $22,000.

City of Tulsa Title 49 Ch. 3 building permit fees (Ord. 25351, July 17, 2024), retrieved Sep 1, 2026. These totals are for the City of Tulsa, not Tulsa County.

City of Tulsa Development Services (building permits) applies this schedule inside the city. For a residential roof replacement on this row, a permit is required.

The official fee band is $213 / $213 / $213. The low fee, the typical fee, and the high fee are each $213.

The official typical project value is $12,000. The project values used for this fee are $8,000 low, $12,000 typical, and $22,000 high.

Walk the typical first. The $12,000 typical job sits in the single $5,000.01 to $40,000 band, so the building permit fee is $213.

The line Building permit fee (Title 49 §302) is that same $213 building permit fee. The application fee is credited against this amount so the total equals the building permit fee, and it is not added on top.

Low and high match that same $213 because the $8,000 low job and the $22,000 high job sit in the same $5,000.01 to $40,000 band. The low fee is $213.

The high fee is $213. The $213 high is the same total as the $213 typical and is not a second charge.

Roof area is not an input to this listed permit total. Documented roof sizes, including 1,000 / 1,500 / 1,800 sf of roof surface, do not change the $213.

A larger documented roof and a smaller documented roof still produce $213 on this path. A job above $40,000 would leave this listed band, and this page does not state that next-band fee.

Chapter 1 administrative fees are required by the ordinance, but the Chapter 1 dollar table is not published in the fee schedule and not added. This page does not state a dollar amount for those Chapter 1 administrative fees.

This page does not invent plan-review add-ons. This page does not invent technology fees.

This page does not invent a fee beyond the official $213. The calculator rounds the official $213 to the nearest dollar before it adds the permit to the all-in estimate, and that rounding does not change the official fee.

City of Tulsa, not the county. Chapter 1 administrative fees are required by the ordinance but the Chapter 1 dollar table is not published in the fee schedule and is not added.

City of Tulsa Title 49 Ch. 3 building permit fees (Ord. 25351, July 17, 2024) Retrieved Sep 1, 2026.

HVAC replacement

Fee basis: Flat fee.

Project value on this row: $7,500.

  • Typical 3-ton (36,000 BTU) like-for-like split = heating $35 + refrigeration $47 = $82.

Low = heating only $35. High = $35+$47+$35 ducts = $117.

Like-for-like HVAC uses the mechanical fixture table, not the building valuation table. Chapter 1 admin fees not added. Electrical HVAC-unit $81 is extra and not included.

City of Tulsa Title 49 mechanical permit fees (Ord. 25351) Retrieved Sep 1, 2026.

Kitchen remodel

Fee basis: Based on project value.

Project value for the formula: low $15,000, typical $35,000, high $75,000.

Low/typical $15k–$35k = $213.

  • High $75,000 = $6 × 75 = $450.00.

Typical-job spec 200 sf.

Kitchen remodel on the building valuation table. $75,000 uses $6 per $1,000 = $450. Chapter 1 admin fees not added.

City of Tulsa Title 49 Ch. 3 building permit fees (Ord. 25351, July 17, 2024) Retrieved Sep 1, 2026.

Questions about these permit fees

How much is a roof replacement permit in Tulsa?

The typical permit fee is $213. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $22,000. Source: City of Tulsa Title 49 Ch. 3 building permit fees (Ord. 25351, July 17, 2024). Retrieved Sep 1, 2026.

How much is an HVAC replacement permit in Tulsa?

The typical permit fee is $82. The range is $35 to $117. Fee basis: Flat fee. Project value on this row: $7,500. Source: City of Tulsa Title 49 mechanical permit fees (Ord. 25351). Retrieved Sep 1, 2026.

How much is a deck permit in Tulsa?

The typical permit fee is $213. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $19,200. Source: City of Tulsa Title 49 Ch. 3 building permit fees (Ord. 25351, July 17, 2024). Retrieved Sep 1, 2026.

How much is a kitchen remodel permit in Tulsa?

The typical permit fee is $213. The range is $213 to $450. Fee basis: Based on project value. Project value for the formula: low $15,000, typical $35,000, high $75,000. Source: City of Tulsa Title 49 Ch. 3 building permit fees (Ord. 25351, July 17, 2024). Retrieved Sep 1, 2026.

Where do I apply for a building permit in Tulsa?

Apply with City of Tulsa – Development Services / building permits. The permit portal is https://www.cityoftulsa.org/.