Deck cost in Indianapolis, IN
$30–$60 per sq ft; average job $8,316 (range $4,340–$12,652). A 16×20 (320 sf) table is $12,800–$19,200. Pressure-treated is the low end; second-story / high-end wood / custom is the high end.
Labor for Deck in Indianapolis, IN is indexed to the BLS construction-and-extraction occupations mean hourly wage for Indianapolis-Carmel-Greenwood, IN of $32.24 (May 2025), applied to the 50% labor share.
Indianapolis Department of Business and Neighborhood Services (DBNS) is the issuing office. The typical permit fee recorded from Indianapolis Revised Code §536-201(b)(15) and accessory Class 2 fees (Proposal 239, 2025), retrieved 2026-09-01, is $490. Fee model: area.
The national typical for this job is $45. Materials stay at the national figure while labor is wage-indexed for Indianapolis, IN.
Walking surface only. A 16 by 20 deck is 320 sqft.
Typical all-in
$15,077
Job cost plus the recorded local permit fee at this size.
- Low
- $10,215
- Typical
- $15,077
- High
- $19,940
Breakdown
| Labor (allocated) | $7,294 |
|---|---|
| Materials (allocated) | $7,293 |
| Job subtotal | $14,587 |
| Permit | $490 |
| All-in typical | $15,077 |
Labor is adjusted for construction wages in this metro. Materials stay at the national figure. This is an estimate, not a contractor quote.
Permit fee
- Fee model
- area
- Typical fee
- $490
- Range
- $490
- Retrieved
- 2026-09-01
- Accessory Class 2 structure 201–1,000 sf — $300320 sf typical. Included.
- Application fee 536-619 — $40Included.
- New-accessory plan review — $150Included.
$300+$40+$150=$490 at 200/320/400 sf (all inside 201–1,000 sf).
Exempt if no part of the floor is more than 30 inches above finished grade and assessor notice 536-215 is filed. Typical 16×20 dataset deck is treated as >30 in.
Indianapolis Revised Code §536-201(b)(15) and accessory Class 2 fees (Proposal 239, 2025)
Citations
- How Much Does It Cost to Build a Deck? [2026 Data] Retrieved Aug 12, 2026. Average $8,316; $4,340–$12,652; $30–$60/sf; labor $15–$35/sf.
- Indianapolis Revised Code §536-201(b)(15) and accessory Class 2 fees (Proposal 239, 2025) Retrieved Aug 31, 2026. Exempt if no part of the floor is more than 30 inches above finished grade and assessor notice 536-215 is filed. Typical 16×20 dataset deck is treated as >30 in.
- BLS OEWS construction wages — Indianapolis-Carmel-Greenwood, IN BLS OEWS construction-and-extraction mean hourly wage / national same vintage, applied to laborShare only. Not a city-specific bid survey.
Other projects in Indianapolis
Deck in other cities
- Seattle, WA
- Charlotte, NC
- Austin, TX
- Denver, CO
- Phoenix, AZ
- Nashville, TN
- Atlanta, GA
- Portland, OR
- Minneapolis, MN
- Raleigh, NC
- Chicago, IL
- Houston, TX
- Los Angeles, CA
- Dallas, TX
- Miami, FL
- Boston, MA
- Philadelphia, PA
- San Diego, CA
- Las Vegas, NV
- Washington, DC
- San Antonio, TX
- Fort Worth, TX
- Tampa, FL
- Orlando, FL
- Jacksonville, FL
- Columbus, OH
- Sacramento, CA
- Kansas City, MO
- Detroit, MI
- San Jose, CA
- San Francisco, CA
- El Paso, TX
- Oklahoma City, OK
- Baltimore, MD
- Milwaukee, WI
- Memphis, TN
- Louisville, KY
- Albuquerque, NM
- Tucson, AZ