CostInMyCity

Gilbert, AZ / Kitchen remodel

Kitchen remodel cost in Gilbert, AZ

Remodeled kitchen $75–$250/sf; average remodel $14,600–$41,300. A new-from-scratch kitchen around $65,000 ($35,000–$95,000) is a different scope and is not this typical. $35,000 typical is the midpoint of that remodel band, rounded. Labor is often quoted as about 25% of the project.

Labor for Kitchen remodel in Gilbert, AZ is indexed to the BLS construction-and-extraction occupations mean hourly wage for Phoenix-Mesa-Chandler, AZ of $29.42 (May 2025), applied to the 25% labor share.

Reuses already-cited Phoenix-Mesa-Chandler May 2025 construction mean $29.42 (same OEWS metro as phoenix-az / mesa-az / scottsdale-az / chandler-az).

Town of Gilbert Planning and Development is the issuing office. The typical permit fee recorded from Town of Gilbert Planning & Development Fees and Charges (revised 7/1/2026), retrieved 2026-09-01, is $734. Fee model: valuation.

The national typical for this job is $150. Materials stay at the national figure while labor is wage-indexed for Gilbert, AZ.

Room area. 150 to 250 sqft is a common mid-range kitchen.

Typical all-in

$30,139

Job cost plus the recorded local permit fee at this size.

Low
$15,091
Typical
$30,139
High
$50,225

Breakdown

Labor (allocated)$7,380
Materials (allocated)$22,140
Job subtotal$29,520
Permit$619
All-in typical$30,139

Labor is adjusted for construction wages in this metro. Materials stay at the national figure. This is an estimate, not a contractor quote.

Permit fee

Fee model
Based on project value
Typical fee
$619
Range
$331 – $1,025
Retrieved
2026-09-01
  • Building permit (valuation table) — $445Included at typical assumed valuation.
  • Building plan review 65% — $289Included.

Typical assumed $35,000: building $445.0 + 65% plan $289.25 = $734.25. Low $15,000 = $391.88. High $75,000 = $1214.81.

Town of Gilbert (Census Gilbert town), not Phoenix. Revised 7/1/2026 building permit table plus 65% plan review. Individual mechanical $150 is not used on roof/deck/kitchen.

Town of Gilbert Planning & Development Fees and Charges (revised 7/1/2026)

Citations

  1. Kitchen Installation Cost [2026 Data] Retrieved Aug 12, 2026. Remodel $75–$250/sf; average remodel $14,600–$41,300; new install ~$65,000 ($35k–$95k); labor ~25%.
  2. Town of Gilbert Planning & Development Fees and Charges (revised 7/1/2026) Retrieved Aug 31, 2026. Town of Gilbert (Census Gilbert town), not Phoenix. Revised 7/1/2026 building permit table plus 65% plan review. Individual mechanical $150 is not used on roof/deck/kitchen.
  3. BLS OEWS construction wages — Phoenix-Mesa-Chandler, AZ BLS OEWS construction-and-extraction mean hourly wage / national same vintage, applied to laborShare only. Not a city-specific bid survey.

Other projects in Gilbert

Kitchen remodel in other cities