Building Permit Fees in Dallas, TX (2026)

Planning and Development – Building Inspection (Development Services) is the permit office for Dallas, TX. The fee schedule year is 2025.

Updated Sep 1, 2026 · Fees checked Sep 1, 2026

Permit fees by job

Building permit fees in Dallas, TX by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $196

Range $196 to $422.42

Flat fee. Project value on this row: low $8,000, typical $12,000, high $22,000.

Full roof replacement calculation below

City of Dallas Permit Fee Schedule effective July 1, 2025 (Tables B-II / B-I) and Chapter 52

Retrieved Sep 1, 2026

HVAC replacement

Typical $315

Range $315 to $345.39

Based on project value. Project value for the formula: low $5,000, typical $7,500, high $16,000.

Full HVAC replacement calculation below

Dallas Table B-I (standalone trade permits) and Chapter 52 §301.2.3 / §303.5.29

Retrieved Sep 1, 2026

Deck

Typical $196

Range $196 to $386.47

Flat fee. Project value on this row: low $8,000, typical $12,000, high $19,200.

Full deck calculation below

Dallas Chapter 52 §301.2.1(13), Table B-II / B-I, technology $15

Retrieved Sep 1, 2026

Kitchen remodel

Typical $396

Range $296 to $1,352.79

Flat fee. Project value on this row: low $15,000, typical $35,000, high $75,000.

Full kitchen remodel calculation below

Dallas Tables B-II and B-I; Chapter 52 §301.2.1(1)(8), §303.2.1.1

Retrieved Sep 1, 2026

How each fee is calculated

Roof replacement

Fee basis: Flat fee.

Project value on this row: low $8,000, typical $12,000, high $22,000.

City of Dallas Permit Fee Schedule effective July 1, 2025 (Tables B-II / B-I) and Chapter 52 (source retrieved Sep 1, 2026). The typical path is Table B-II, alterations or repairs of a single-family or duplex structure: base permit fee $181 per dwelling unit plus the technology permit fee of $15 (Chapter 52 §303.5.29) = $196.

That same $196 is the low fee of $196 and the typical fee of $196 at the official valuations of $8,000, $12,000, and $22,000. The Table B-II additional-trade line of $100 is not added on this listed roof path.

The official typical project value is $12,000. The high bound applies only if the job is processed as a standalone trade permit on Table B-I, which covers alterations or repairs including standalone trade permits, at the official $22,000 valuation: value × 0.009652 × 1.33 = $282.42.

The Table B-I minimum permit fee of $175 is not binding because $282.42 is higher. Add the additional inspection service fee of $125 plus the $15 technology fee: $282.42 + $125 + $15 = $422.42, which is the high fee of $422.42.

That Table B-I total is not used for the published low or typical fees. A separate Table B-I total at $8,000 or $12,000 is not listed.

Exempt only if the reroof is 2 roofing squares or less. Listed assumed valuations are $8,000, $12,000, and $22,000.

Single-family and duplex master permits use Table B-II $181 plus the $15 technology fee. Table B-I is the high bound if the job is processed as a standalone trade permit. Exempt only if the reroof is 2 roofing squares or less.

City of Dallas Permit Fee Schedule effective July 1, 2025 (Tables B-II / B-I) and Chapter 52 Retrieved Sep 1, 2026.

HVAC replacement

Fee basis: Based on project value.

Project value for the formula: low $5,000, typical $7,500, high $16,000.

Dallas Table B-I (standalone trade permits) and Chapter 52 §301.2.3 / §303.5.29 (source retrieved Sep 1, 2026). Standalone trade permits use Table B-I: max($175, value × 0.009652 × 1.33) plus the additional inspection per trade of $125 plus the technology permit fee of $15 (Chapter 52 §303.5.29).

The fee is based on the project valuation. A permit is required on the official typical path.

The low fee is $315, the typical fee is $315, and the high fee is $345.39. The official typical project value is $7,500.

Listed assumed valuations are $5,000 low, $7,500 typical, and $16,000 high. Walk the fee in three steps on the typical path.

  1. Step 1: confirm the job is a standalone trade permit on Table B-I, not an exempt like-for-like permanent electric HVAC swap under Chapter 52 §301.2.3(8).
  2. Step 2: compare the valuation line value × 0.009652 × 1.33 to the Table B-I minimum of $175.

At the official $7,500 valuation that line stays below $175, so the minimum binds. A separate valuation-line dollar at $7,500 is not listed.

  1. Step 3: add the additional inspection per trade of $125 and the technology permit fee of $15. $175 + $125 + $15 = $315, which is the typical fee of $315.

The official extras are the $175 Table B-I minimum permit, the $125 additional inspection per trade, and the $15 technology fee, and all three are included in the $315.

  • Low $5,000: the valuation line is also below $175, so the same minimum applies.

A separate valuation-line dollar at $5,000 is not listed. Then $175 + $125 + $15 = $315, which is the low fee of $315.

  • High $16,000: value × 0.009652 × 1.33 = $205.39.

The Table B-I minimum of $175 is not binding because $205.39 is higher. Add the additional inspection per trade of $125 plus the $15 technology fee: $205.39 + $125 + $15 = $345.39, which is the high fee of $345.39.

The $345.39 high is not added on top of the $315 typical. Chapter 52 §301.2.3(8) exempts like-for-like permanent electric HVAC with no rough-in change.

A typical gas furnace plus air conditioner is not that exemption. That exemption is not the low fee, the typical fee, or the high fee, and this note does not add a $0 line.

This note does not invent a fee beyond the official $315, $315, and $345.39 totals.

Chapter 52 §301.2.3(8) exempts like-for-like permanent electric HVAC with no rough-in change. A typical gas furnace plus air conditioner is not that exemption.

Dallas Table B-I (standalone trade permits) and Chapter 52 §301.2.3 / §303.5.29 Retrieved Sep 1, 2026.

Deck

Fee basis: Flat fee.

Project value on this row: low $8,000, typical $12,000, high $19,200.

Dallas Chapter 52 §301.2.1(13), Table B-II / B-I, technology $15 (source retrieved Sep 1, 2026). The official typical path is a Table B-II permit for a typical attached deck.

Table B-II covers alterations or repairs of a single-family or duplex structure: base permit fee $181 per dwelling unit plus the technology permit fee of $15. The fee is a flat amount.

A permit is required on that typical path. The low fee is $196, the typical fee is $196, and the high fee is $386.47.

The official typical project value is $12,000. Listed assumed valuations are $8,000 low, $12,000 typical, and $19,200 high.

Table B-II does not scale with the $8,000 or $12,000 valuations, so those amounts do not change the official $196 fee. The high bound is Table B-I at the official $19,200 valuation and is not used for the published low or typical fees.

  • Low $8,000: valuation is not an input on Table B-II, so the low fee stays $196.

That path is Table B-II $181 plus the technology permit fee of $15. $181 + $15 = $196, so the low fee is $196. The technology permit fee is $15 per document (Chapter 52 §303.5.29).

  • Typical $12,000: valuation is not an input on Table B-II, so the typical fee stays $196.

That path is the same Table B-II $181 plus the technology permit fee of $15. $181 + $15 = $196, so the typical fee is $196. The official extra for Table B-II + technology is included as the typical and is not added again.

The typical attached deck uses Table B-II $196.

  • High $19,200: Table B-I covers alterations or repairs, including standalone trade permits, at the official $19,200 valuation. value × 0.009652 × 1.33 = $246.47.

The Table B-I minimum permit fee of $175 is not binding because $246.47 is higher. Add the additional inspection service fee of $125 plus the technology permit fee of $15: $246.47 + $125 + $15 = $386.47, so the high fee is $386.47.

The $386.47 high is not added on top of the $196 typical. A separate Table B-I total at $8,000 or $12,000 is not listed.

Chapter 52 §301.2.1(13) exempts a deck only if all of these are true: 200 square feet or less, 30 inches or less, not attached to the dwelling, not under a service drop, and it does not serve the required exit. That exemption is not the official typical path.

It is not the low fee, the typical fee, or the high fee, and this note does not add a $0 line. The official typical path stays the Table B-II attached-deck total of $196.

The official high stays Table B-I at $19,200. This note does not invent a fee beyond the official $196, $196, and $386.47 totals.

Exemption 301.2.1(13) only if all of: ≤200 sf, ≤30 in., not attached to the dwelling, not under a service drop, does not serve the required exit. Typical attached deck uses B-II $196.

Dallas Chapter 52 §301.2.1(13), Table B-II / B-I, technology $15 Retrieved Sep 1, 2026.

Kitchen remodel

Fee basis: Flat fee.

Project value on this row: low $15,000, typical $35,000, high $75,000.

Dallas Tables B-II and B-I; Chapter 52 §301.2.1(1)(8), §303.2.1.1 (source retrieved Sep 1, 2026). The official typical path is a Table B-II master permit for alterations or repairs of a single-family or duplex structure, with extra trades.

Chapter 52 §303.2.1.1 sends single-family and duplex alterations and repairs to Table B-II. The fee is a flat amount.

A permit is required on that typical path. The low fee is $296, the typical fee is $396, and the high fee is $1,352.79.

The official typical project value is $35,000. Listed assumed valuations are $15,000 low, $35,000 typical, and $75,000 high.

Table B-II does not scale with the $15,000 or $35,000 valuations, so those amounts do not change the official $296 and $396 fees. The high bound is Table B-I at the official $75,000 valuation and is not used for the published low or typical fees.

  • Low $15,000: valuation is not an input on Table B-II, so the low fee stays $296.

That path is Table B-II master $181 + 2 additional trades $100 + the technology permit fee of $15. $181 + $100 + $15 = $296, so the low fee is $296. The technology permit fee is $15 per document (Chapter 52 §303.5.29).

  • Typical $35,000: valuation is not an input on Table B-II, so the typical fee stays $396.

That path is Table B-II master $181 + 3 additional trades $200 + the technology permit fee of $15. $181 + $200 + $15 = $396, so the typical fee is $396. The official extra for Table B-II master + 3 additional trades + tech is included as the typical and is not added again.

The 2-additional-trade path of $296 is the low fee and is not the typical total.

  • High $75,000: Table B-I covers alterations or repairs, including standalone trade permits, at the official $75,000 valuation. value × 0.009652 × 1.33 = $962.79.

The Table B-I minimum permit fee of $175 is not binding because $962.79 is higher. Three trades use the additional inspection service fee of $125 per trade, which is 3 × $125 = $375.

Add the technology permit fee of $15: $962.79 + $375 + $15 = $1,352.79, so the high fee is $1,352.79. The $1,352.79 high is not added on top of the $396 typical.

A separate Table B-I total at $15,000 or $35,000 is not listed. Chapter 52 §301.2.1(1) lists painting, papering, paneling, floor coverings, cabinets, moldings, countertops, and similar finish work as work for which a building permit is not required.

Chapter 52 §301.2.1(8) lists interior remodeling of nonload-bearing components of a single-family or duplex premises that does not add floor area. Cabinets, countertops, paint, or flooring only is the cosmetic-only path.

That cosmetic-only path is not the official typical totals. It is not the low fee, the typical fee, or the high fee, and this note does not add a $0 line.

The official typical path stays the Table B-II master with extra trades. The official high stays the Table B-I valuation with 3 trades.

This note does not invent a fee beyond the official $296, $396, and $1,352.79 totals.

Cabinets/countertops/paint/flooring only → building permit not required. Typical path is B-II master with extra trades. High is B-I valuation with 3 trades.

Dallas Tables B-II and B-I; Chapter 52 §301.2.1(1)(8), §303.2.1.1 Retrieved Sep 1, 2026.

Questions about these permit fees

How much is a roof replacement permit in Dallas?

The typical permit fee is $196. The range is $196 to $422.42. Fee basis: Flat fee. Project value on this row: low $8,000, typical $12,000, high $22,000. Source: City of Dallas Permit Fee Schedule effective July 1, 2025 (Tables B-II / B-I) and Chapter 52. Retrieved Sep 1, 2026.

How much is an HVAC replacement permit in Dallas?

The typical permit fee is $315. The range is $315 to $345.39. Fee basis: Based on project value. Project value for the formula: low $5,000, typical $7,500, high $16,000. Source: Dallas Table B-I (standalone trade permits) and Chapter 52 §301.2.3 / §303.5.29. Retrieved Sep 1, 2026.

How much is a deck permit in Dallas?

The typical permit fee is $196. The range is $196 to $386.47. Fee basis: Flat fee. Project value on this row: low $8,000, typical $12,000, high $19,200. Source: Dallas Chapter 52 §301.2.1(13), Table B-II / B-I, technology $15. Retrieved Sep 1, 2026.

How much is a kitchen remodel permit in Dallas?

The typical permit fee is $396. The range is $296 to $1,352.79. Fee basis: Flat fee. Project value on this row: low $15,000, typical $35,000, high $75,000. Source: Dallas Tables B-II and B-I; Chapter 52 §301.2.1(1)(8), §303.2.1.1. Retrieved Sep 1, 2026.

Where do I apply for a building permit in Dallas?

Apply with Planning and Development – Building Inspection (Development Services). The permit portal is https://dallascityhall.com/departments/sustainabledevelopment/buildinginspection/Pages/default.aspx.