Building Permit Fees in Toledo, OH (2026)

City of Toledo Division of Building Inspection is the permit office for Toledo, OH. The fee schedule year is 2018.

Updated Sep 1, 2026 ยท Fees checked Sep 1, 2026

Permit fees by job

Building permit fees in Toledo, OH by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $60.60

Typical/low/high like-for-like reroof = $60.00 x 1.01 = $60.60. Documented 1,000/1,500/1,800 sf does not change this flat.

Full roof replacement calculation below

City of Toledo Municipal Code Chapter 1307 Fees (Ord. 476-18; 2026 S-105 still posted)

Retrieved Sep 1, 2026

HVAC replacement

Typical $151.50

Range $75.75 to $227.25

Typical 3-ton (36,000 BTU) like-for-like split = 2 x $75 = $150.00 x 1.01 = $151.50. Low 1 unit = $75.75. High 2 units + ductwork $75 = $227.25.

Full HVAC replacement calculation below

City of Toledo TMC 1307.06 HVAC permit fees (Ord. 476-18)

Retrieved Sep 1, 2026

Deck

Typical $235.94

Range $208.06 to $254.52

Typical 16x20 = 320 sf: building $124.0 + plan $59.6 + zoning $50.00 = $233.6 x 1.01 = $235.94. Low 200 sf = $208.06. High 400 sf = $254.52.

Full deck calculation below

City of Toledo Municipal Code Chapter 1307 Fees (Ord. 476-18; 2026 S-105 still posted)

Retrieved Sep 1, 2026

Kitchen remodel

Typical $157.56

Range $145.95 to $204.02

Typical-job spec 200 sf: building $100.0 + plan $56.0 = $156.0 x 1.01 = $157.56. Low 150 sf = $145.95. High 400 sf = $204.02.

Full kitchen remodel calculation below

City of Toledo Municipal Code Chapter 1307 Fees (Ord. 476-18; 2026 S-105 still posted)

Retrieved Sep 1, 2026

How each fee is calculated

Roof replacement

Fee basis: Flat fee.

Project value on this row: low $8,000, typical $12,000, high $22,000.

Typical/low/high like-for-like reroof = $60.00 x 1.01 = $60.60. Documented 1,000/1,500/1,800 sf does not change this flat.

City of Toledo, not Columbus and not Cleveland. Covering-only reroof is 1307.02(a)2 $60 per alteration. Zoning certificate is required for decks/accessory structures, not for this reroof line. Ohio 1% added.

City of Toledo Municipal Code Chapter 1307 Fees (Ord. 476-18; 2026 S-105 still posted) Retrieved Sep 1, 2026.

HVAC replacement

Fee basis: Flat fee.

Project value on this row: $7,500.

  • Typical 3-ton (36,000 BTU) like-for-like split = 2 x $75 = $150.00 x 1.01 = $151.50.
  • Low 1 unit = $75.75.
  • High 2 units + ductwork $75 = $227.25.

City of Toledo. Residential HVAC $75 per unit (new or replacement). Typical 3-ton like-for-like split = furnace + AC (2 units). Low is one unit. High adds the $75 ductwork line. Ohio 1% added.

City of Toledo TMC 1307.06 HVAC permit fees (Ord. 476-18) Retrieved Sep 1, 2026.

Deck

Fee basis: Per square foot.

Project value on this row: low $8,000, typical $12,000, high $19,200.

  • Typical 16x20 = 320 sf: building $124 + plan $59.60 + zoning $50.00 = $233.60 x 1.01 = $235.94.
  • Low 200 sf = $208.06.
  • High 400 sf = $254.52.

City of Toledo. New deck uses 1307.02(a)1 alterations/accessory ($60 + $0.20/sf) plus residential plan review ($50 + $0.03/sf) plus zoning certificate $50. Ohio 1% on the city subtotal.

City of Toledo Municipal Code Chapter 1307 Fees (Ord. 476-18; 2026 S-105 still posted) Retrieved Sep 1, 2026.

Kitchen remodel

Fee basis: Per square foot.

Project value on this row: low $15,000, typical $35,000, high $75,000.

Typical-job spec 200 sf: building $100 + plan $56 = $156 x 1.01 = $157.56.

  • Low 150 sf = $145.95.
  • High 400 sf = $204.02.

City of Toledo. Kitchen interior alteration uses 1307.02(a)1 plus residential plan review. Electrical and plumbing are separate permits (1305.01) and are not stacked. Zoning certificate is not listed for interior-only work.

City of Toledo Municipal Code Chapter 1307 Fees (Ord. 476-18; 2026 S-105 still posted) Retrieved Sep 1, 2026.

Questions about these permit fees

How much is a roof replacement permit in Toledo?

The typical permit fee is $60.60. Fee basis: Flat fee. Project value on this row: low $8,000, typical $12,000, high $22,000. Source: City of Toledo Municipal Code Chapter 1307 Fees (Ord. 476-18; 2026 S-105 still posted). Retrieved Sep 1, 2026.

How much is an HVAC replacement permit in Toledo?

The typical permit fee is $151.50. The range is $75.75 to $227.25. Fee basis: Flat fee. Project value on this row: $7,500. Source: City of Toledo TMC 1307.06 HVAC permit fees (Ord. 476-18). Retrieved Sep 1, 2026.

How much is a deck permit in Toledo?

The typical permit fee is $235.94. The range is $208.06 to $254.52. Fee basis: Per square foot. Project value on this row: low $8,000, typical $12,000, high $19,200. Source: City of Toledo Municipal Code Chapter 1307 Fees (Ord. 476-18; 2026 S-105 still posted). Retrieved Sep 1, 2026.

How much is a kitchen remodel permit in Toledo?

The typical permit fee is $157.56. The range is $145.95 to $204.02. Fee basis: Per square foot. Project value on this row: low $15,000, typical $35,000, high $75,000. Source: City of Toledo Municipal Code Chapter 1307 Fees (Ord. 476-18; 2026 S-105 still posted). Retrieved Sep 1, 2026.

Where do I apply for a building permit in Toledo?

Apply with City of Toledo Division of Building Inspection. The permit portal is https://toledo.oh.gov/business/how-to-build-in-the-city/permits/permit-application-portal.