Building Permit Fees in Washington, DC (2026)

Department of Buildings (DOB) is the permit office for Washington, DC. The fee schedule year is 2026.

Updated Oct 7, 2026 · Fees checked Oct 7, 2026

Permit fees by job

Building permit fees in Washington, DC by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $0, no permit

The typical path does not require a permit.

No permit fee. Project value on this row: low $8,000, typical $12,000, high $22,000.

Full roof replacement calculation below

DC DOB permit exemptions (12-A DCMR § 105.2) and Building Permit Fee Schedule

Retrieved Oct 7, 2026

HVAC replacement

Typical $50.60

Range $50.60 to $407.88

Typical $46×1.10=$50.60. High at $16,000: (30+320)×1.10=385; green 20.80×1.10=22.88; total 407.88.

Full HVAC replacement calculation below

DC DOB Building Permit Fee Schedule; Instant Permits

Retrieved Sep 1, 2026

Deck

Typical $297

Range $209 to $455.40

$8k: (30+160)×1.10=209. $12k: (30+240)×1.10=297. $19.2k: (30+384)×1.10=455.40.

Full deck calculation below

DC DOB Deck Permit FAQ and Building Permit Fee Schedule

Retrieved Sep 1, 2026

Kitchen remodel

Typical $853.05

Range $384.45 to $1,790

$15k: 363+21.45=384.45. $35k: 803+50.05=853.05. $75k: 1683+107.25=1790.25.

Full kitchen remodel calculation below

DC DOB Building Permit Fee Schedule (alteration/repair); 12-M DCMR §§ 100.2, 101.1

Retrieved Sep 1, 2026

How each fee is calculated

Roof replacement

Fee basis: No permit fee.

Project value on this row: low $8,000, typical $12,000, high $22,000.

DC DOB permit exemptions (12-A DCMR § 105.2) and Building Permit Fee Schedule (retrieved Oct 7, 2026). The official typical path is like-kind roofing and coping under § 105.2, outside a historic district and outside a Special Flood Hazard Area.

No permit fee applies. A permit is not required on that typical path.

The low fee is $0, the typical fee is $0, and the high fee is $0. The official typical project value is $12,000.

Listed assumed valuations are $8,000 low, $12,000 typical, and $22,000 high. Those valuations are unused on the like-kind exempt path and do not create a DOB permit fee.

Walk the three bands.

  • Low $8,000: valuation is unused, so the low fee stays $0.
  • Typical $12,000: valuation is unused, so the typical fee stays $0.
  • High $22,000: valuation is unused, so the high fee stays $0.

The $0 high is the same total as the $0 typical and is not added on top of it. Exterior work in a historic district or on a historically designated structure (§ 105.2.5), work in a Special Flood Hazard Area (§ 105.2.6), or a material change that is not in-kind each requires a permit.

When a permit is required, the alteration and repair line on the DOB Building Permit Fee Schedule applies: for construction valued $1,001 to $1 million, the permit fee is ($30 + 2% of construction value) × 1.10 for the 10% additional fee, plus a Green Building Fee of 0.13% of construction value × 1.10. At $8,000 that path is ($30 + $160) × 1.10 = $209, plus green $10.40 × 1.10 = $11.44, for $220.44.

At $12,000 it is ($30 + $240) × 1.10 = $297, plus green $15.60 × 1.10 = $17.16, for $314.16. At $22,000 it is ($30 + $440) × 1.10 = $517, plus green $28.60 × 1.10 = $31.46, for $548.46.

The $12,000 and $22,000 permitted-path totals are listed extras and are not in the $0 / $0 / $0 totals. The schedule's filing fee is 50% of the assessed permit fee, collected at filing and part of that fee, not an added fee.

This note does not invent a fee beyond the official $0 total.

Like-kind roofing/coping is exempt under 12-A DCMR § 105.2 outside historic districts (§ 105.2.5) and Special Flood Hazard Areas (§ 105.2.6). Material change is not in-kind. When a permit is required, use the alteration formula ($30 + 2% of value) × 1.10 plus the Green Building Fee 0.13% of value × 1.10.

DC DOB permit exemptions (12-A DCMR § 105.2) and Building Permit Fee Schedule Retrieved Oct 7, 2026.

HVAC replacement

Fee basis: Flat fee.

Project value on this row: low $5,000, typical $7,500, high $16,000.

  • Typical $46×1.10=$50.60.

High at $16,000: (30+320)×1.10=385; green 20.80×1.10=22.88; total 407.88.

Replacement HVAC requires a permit. Typical one unit ≤10 tons is Instant Mechanical $50.60, not 2% of contract. High is the alteration path at $16k if Instant does not apply. Trades can stack.

DC DOB Building Permit Fee Schedule; Instant Permits Retrieved Sep 1, 2026.

Deck

Fee basis: Based on project value.

Project value for the formula: low $8,000, typical $12,000, high $19,200.

$8k: (30+160)×1.10=209. $12k: (30+240)×1.10=297. $19.20k: (30+384)×1.10=455.40.

DOB Deck FAQ prices ($30+2%V)×1.10 only; does not add the green fee. Plat required for new decks. Historic/CFA may add review.

DC DOB Deck Permit FAQ and Building Permit Fee Schedule Retrieved Sep 1, 2026.

Kitchen remodel

Fee basis: Based on project value.

Project value for the formula: low $15,000, typical $35,000, high $75,000.

$15k: 363+21.45=384.45. $35k: 803+50.05=853.05. $75k: 1683+107.25=1790.25.

Cabinets/countertops/finish-only exempt. Typical remodel is Alteration & Repair. Plumbing/electrical unit fees extra; fixture counts not assumed. Green included from the alteration schedule.

DC DOB Building Permit Fee Schedule (alteration/repair); 12-M DCMR §§ 100.2, 101.1 Retrieved Sep 1, 2026.

Questions about these permit fees

How much is a roof replacement permit in Washington?

The typical permit fee is $0, no permit. The typical path does not require a permit. Fee basis: No permit fee. Project value on this row: low $8,000, typical $12,000, high $22,000. Source: DC DOB permit exemptions (12-A DCMR § 105.2) and Building Permit Fee Schedule. Retrieved Oct 7, 2026.

Do I need a permit for a roof replacement in Washington?

No. The typical path does not require a permit. Fee basis: No permit fee. Like-kind roofing/coping is exempt under 12-A DCMR § 105.2 outside historic districts (§ 105.2.5) and Special Flood Hazard Areas (§ 105.2.6). Material change is not in-kind. When a permit is required, use the alteration formula ($30 + 2% of value) × 1.10 plus the Green Building Fee 0.13% of value × 1.10.

How much is an HVAC replacement permit in Washington?

The typical permit fee is $50.60. The range is $50.60 to $407.88. Fee basis: Flat fee. Project value on this row: low $5,000, typical $7,500, high $16,000. Source: DC DOB Building Permit Fee Schedule; Instant Permits. Retrieved Sep 1, 2026.

How much is a deck permit in Washington?

The typical permit fee is $297. The range is $209 to $455.40. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $19,200. Source: DC DOB Deck Permit FAQ and Building Permit Fee Schedule. Retrieved Sep 1, 2026.

How much is a kitchen remodel permit in Washington?

The typical permit fee is $853.05. The range is $384.45 to $1,790. Fee basis: Based on project value. Project value for the formula: low $15,000, typical $35,000, high $75,000. Source: DC DOB Building Permit Fee Schedule (alteration/repair); 12-M DCMR §§ 100.2, 101.1. Retrieved Sep 1, 2026.

Where do I apply for a building permit in Washington?

Apply with Department of Buildings (DOB). The permit portal is https://dob.dc.gov/.