Building Permit Fees in San Diego, CA (2026)

Development Services Department (DSD) is the permit office for San Diego, CA. The fee schedule year is 2026.

Updated Sep 1, 2026 · Fees checked Sep 1, 2026

Permit fees by job

Building permit fees in San Diego, CA by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $0, no permit

The typical path does not require a permit.

No permit fee. Project value on this row: low $8,000, typical $12,000, high $22,000.

Full roof replacement calculation below

DSD IB 123 + SDMC §129.0203 + When is a Permit Required

Retrieved Sep 1, 2026

HVAC replacement

Typical $308.09

Range $131.52 to $484.66

Flat fee. Project value on this row: low $5,000, typical $7,500, high $16,000.

Full HVAC replacement calculation below

DSD IB 103 Table 1B + What Permits Do I Need

Retrieved Sep 1, 2026

Deck

Typical $2,711

Range $2,181 to $3,860

Typical ≤500 sf: $1,677.99+$264.25+$737+$12.16+$1.56+$1+$17.11=$2,711.07. Pre-approved low at $8k=$2,180.85. >500 sf high at $19.2k=$3,860.19.

Full deck calculation below

DSD IB 501 Aug 2026 Table 501C + admin/state fees in IB 501

Retrieved Sep 1, 2026

Kitchen remodel

Typical $440.82

Range $0 to $6,510

Typical = $440.82. Low $0 = cabinets-only. High = $3,512.92+$2,228.29+$737+$12.16+$4.55+$1+$17.11=$6,510.43.

Full kitchen remodel calculation below

DSD IB 103 Table 3A + IB 203 + IB 501 Table 501A

Retrieved Sep 1, 2026

How each fee is calculated

Roof replacement

Fee basis: No permit fee.

Project value on this row: low $8,000, typical $12,000, high $22,000.

The official low fee is $0 and the official typical fee is $0 because a typical residential reroof is an official exemption for like-for-like covering replacement with no roof-structure/diaphragm alteration under SDMC §129.0203(a)(16) and IB 123; no permit fee applies, and a permit is not required on that path. The source named on this row is DSD IB 123 + SDMC §129.0203 + When is a Permit Required, retrieved Sep 1, 2026.

The official typical project value is $12,000, and the assumed valuations are $8,000 low, $12,000 typical, and $22,000 high; the $0 low fee is listed with the $8,000 assumed valuation, and the $0 typical fee is listed with the $12,000 assumed valuation, and both stay $0 because of that like-for-like covering exemption. A permit is needed for historic sites, for coverings over 6 psf, or for structural framing/sheathing beyond the 25% in-kind allowance.

Two extras are listed for work that needs a permit, and neither extra is included in any total: Roof re-sheathing SDU inspection is $264.25 when a permit is required for structure/diaphragm work, plan check for that re-sheathing extra is hourly per IB 123, and the $264.25 is not in the totals; Roof structure replacement plan check + inspection per 2,000 sf is $2,206.38, which equals $1,942.13 plus $264.25, and that $2,206.38 is not in the totals. No high fee is shown because hourly plan check hours are unpublished; the assumed high valuation of $22,000 is listed on the row, and no high fee dollar is filled in.

Official exemption: like-for-like covering replacement with no roof-structure/diaphragm alteration (SDMC §129.0203(a)(16); IB 123). Historic sites, covering >6 psf, or structural framing/sheathing beyond the 25% in-kind allowance need a permit. The high fee is not listed (hourly plan check hours unpublished).

DSD IB 123 + SDMC §129.0203 + When is a Permit Required Retrieved Sep 1, 2026.

HVAC replacement

Fee basis: Flat fee.

Project value on this row: low $5,000, typical $7,500, high $16,000.

City of San Diego Development Services Department Information Bulletin 103, Table 1B, plus the What Permits Do I Need guidance (DSD IB 103 Table 1B + What Permits Do I Need; source retrieved Sep 1, 2026). These fees are for the City of San Diego, not San Diego County, and not other cities in the county such as Chula Vista or El Cajon.

The schedule uses flat per-item fees, and a permit is required. The official fee band is $131.52 low, $308.09 typical, and $484.66 high.

The official typical project value is $7,500. Listed job values are $5,000 low, $7,500 typical, and $16,000 high.

Those job values do not change the fee. Valuation is unused.

The fee is per piece of equipment. It follows the equipment count, not the job price or the home size.

Walk the typical path in three steps.

  1. Step 1: installing or replacing HVAC equipment is Simple MEP work, not the repair-only exemption, so a permit is required.
  2. Step 2: the furnace / forced-air unit line, Furnace / FAU (IB 103 Table 1B), is $176.57 and is included in the typical.
  3. Step 3: the condensing unit line, Condensing unit (HVAC), is $131.52 and is included in the typical. $176.57 + $131.52 = $308.09.

That sum is the official typical total for a furnace plus a condensing unit, and those two lines are not added again. The low path is a condenser-only swap.

Condensing unit (HVAC) is $131.52 by itself, so the official low total is $131.52. The furnace line is not on that low path.

The $131.52 low is not added on top of the $308.09 typical. The high path is a furnace plus a condensing unit plus an air handler or mini-split.

Furnace / FAU (IB 103 Table 1B) is $176.57, Condensing unit (HVAC) is $131.52, and Air handler / mini-split is $176.57. $176.57 + $131.52 + $176.57 = $484.66. That $484.66 high is the official total for those three pieces and is not added on top of the $308.09 typical.

Simple MEP has no plans, so no General Plan Maintenance Fee is added. Electrical or gas line work beyond the equipment swap is not part of the official lines, and this note does not price that work.

This note does not invent a fee beyond the official $131.52, $308.09, and $484.66 totals.

Installing/replacing HVAC is Simple MEP, not the repair-only exemption. Valuation unused. Simple MEP: no plans, so no General Plan Maintenance Fee.

DSD IB 103 Table 1B + What Permits Do I Need Retrieved Sep 1, 2026.

Deck

Fee basis: Flat fee.

Project value on this row: low $8,000, typical $12,000, high $19,200.

Typical ≤500 sf: $1,677.99+$264.25+$737+$12.16+$1.56+$1+$17.11=$2,711.07. Pre-approved low at $8k=$2,180.85. >500 sf high at $19.20k=$3,860.19.

Decks are not in SDMC 129.0203 exemptions. GPMF $737 is included because plan review is required; confirm at intake whether Table 501C miscellaneous items actually assess it. Assumed dollars only affect seismic ($0.13/$1,000).

DSD IB 501 Aug 2026 Table 501C + admin/state fees in IB 501 Retrieved Sep 1, 2026.

Kitchen remodel

Fee basis: Flat fee.

Project value on this row: low $15,000, typical $35,000, high $75,000.

Typical = $440.82.

  • Low $0 = cabinets-only.

High = $3,512.92+$2,228.29+$737+$12.16+$4.55+$1+$17.11=$6,510.43.

Cabinet/countertop relocation in Group R-3 is building-permit exempt. Typical no-plan combo uses only the labeled $440.82; unclear whether IB 501C $529.71 building inspection stacks. High assumes ≤500 sf with framing plus GPMF.

DSD IB 103 Table 3A + IB 203 + IB 501 Table 501A Retrieved Sep 1, 2026.

Questions about these permit fees

How much is a roof replacement permit in San Diego?

The typical permit fee is $0, no permit. The typical path does not require a permit. Fee basis: No permit fee. Project value on this row: low $8,000, typical $12,000, high $22,000. Source: DSD IB 123 + SDMC §129.0203 + When is a Permit Required. Retrieved Sep 1, 2026.

Do I need a permit for a roof replacement in San Diego?

No. The typical path does not require a permit. Fee basis: No permit fee. Official exemption: like-for-like covering replacement with no roof-structure/diaphragm alteration (SDMC §129.0203(a)(16); IB 123). Historic sites, covering >6 psf, or structural framing/sheathing beyond the 25% in-kind allowance need a permit. The high fee is not listed (hourly plan check hours unpublished).

How much is an HVAC replacement permit in San Diego?

The typical permit fee is $308.09. The range is $131.52 to $484.66. Fee basis: Flat fee. Project value on this row: low $5,000, typical $7,500, high $16,000. Source: DSD IB 103 Table 1B + What Permits Do I Need. Retrieved Sep 1, 2026.

How much is a deck permit in San Diego?

The typical permit fee is $2,711. The range is $2,181 to $3,860. Fee basis: Flat fee. Project value on this row: low $8,000, typical $12,000, high $19,200. Source: DSD IB 501 Aug 2026 Table 501C + admin/state fees in IB 501. Retrieved Sep 1, 2026.

How much is a kitchen remodel permit in San Diego?

The typical permit fee is $440.82. The range is $0 to $6,510. Fee basis: Flat fee. Project value on this row: low $15,000, typical $35,000, high $75,000. Source: DSD IB 103 Table 3A + IB 203 + IB 501 Table 501A. Retrieved Sep 1, 2026.

Where do I apply for a building permit in San Diego?

Apply with Development Services Department (DSD). The permit portal is https://www.sandiego.gov/development-services.