Building Permit Fees in Detroit, MI (2026)

Detroit Buildings, Safety Engineering and Environmental Department (BSEED) is the permit office for Detroit, MI. The fee schedule year is 2025.

Updated Oct 7, 2026 · Fees checked Oct 7, 2026

Permit fees by job

Building permit fees in Detroit, MI by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $612.33

Range $475.97 to $953.23

Based on project value. Project value for the formula: low $8,000, typical $12,000, high $22,000.

Full roof replacement calculation below

City of Detroit BSEED Fee Schedule, effective Jan 1, 2024, modified July 18, 2025 – Building and Residential Permits

Retrieved Sep 1, 2026

HVAC replacement

Typical $272

Range $142 to $301

Low furnace-only $142. Typical $142+$130=$272. High $272+$29 electrical=$301.

Full HVAC replacement calculation below

Detroit BSEED Fee Schedule – gas-fired installation permits and refrigerating systems

Retrieved Sep 1, 2026

Deck

Typical $612.33

Range $475.97 to $885.05

Based on project value. Project value for the formula: low $8,000, typical $12,000, high $19,200.

Full deck calculation below

Detroit BSEED Fee Schedule (effective Jan 1, 2024, modified July 18, 2025): New Buildings, Alterations, Repairs, And Additions

Retrieved Oct 7, 2026

Kitchen remodel

Typical $1,483

Range $714.60 to $2,602

$15,000 building only $271.43+$34.09×13=$714.60. $35,000: $1,300.87 + 14% = $1,482.99. $75,000: $1,055.57+$24.53×50=$2,282.07 + 14% = $2,601.56.

Full kitchen remodel calculation below

Detroit BSEED Fee Schedule – building permits and E/M/P 7% plan review

Retrieved Sep 1, 2026

How each fee is calculated

Roof replacement

Fee basis: Based on project value.

Project value for the formula: low $8,000, typical $12,000, high $22,000.

City of Detroit BSEED Fee Schedule, effective Jan 1, 2024, modified July 18, 2025 – Building and Residential Permits (source retrieved Sep 1, 2026). The official typical path is the building/residential permit band for $2,001–$25,000: base $271.43 plus $34.09 per additional $1,000 or fraction above $2,000.

The fee is based on the project valuation. A permit is required on that typical path.

The low fee is $475.97, the typical fee is $612.33, and the high fee is $953.23. The official typical project value is $12,000.

Listed assumed valuations are $8,000 low, $12,000 typical, and $22,000 high. All three valuations sit in the $2,001–$25,000 band, and each is an exact thousand above $2,000, so no fractional thousand is added.

The 35% plan-review is a deposit credited to the permit, not an add-on, and this note does not add that 35% on top of the official totals.

  • Low $8,000: 6 additional thousands above $2,000, so $271.43 + $34.09 × 6 = $475.97, which is the low fee of $475.97.
  • Typical $12,000: 10 additional thousands above $2,000, so $271.43 + $34.09 × 10 = $612.33, which is the typical fee of $612.33.

The official extra named Building/residential permit $2,001–$25,000 is $612.33 and is included in the typical total. It is not added again.

  • High $22,000: 20 additional thousands above $2,000, so $271.43 + $34.09 × 20 = $953.23, which is the high fee of $953.23.

The $953.23 high is not added on top of the $612.33 typical. No like-kind reroof exemption was found in this schedule, so this note does not add a $0 exemption line.

Project cost uses the published square-foot cost table or the contract. This note does not invent a fee beyond the official $475.97, $612.33, and $953.23 totals.

No like-kind reroof exemption found in this schedule. Project cost uses the published square-foot cost table or contract.

City of Detroit BSEED Fee Schedule, effective Jan 1, 2024, modified July 18, 2025 – Building and Residential Permits Retrieved Sep 1, 2026.

HVAC replacement

Fee basis: Flat fee.

Project value on this row: low $5,000, typical $7,500, high $16,000.

Low furnace-only $142.

  • Typical $142+$130=$272.
  • High $272+$29 electrical=$301.

HVAC is not the building valuation table. 2-ton through 5-ton furnaces stay in the ≤500,000 BTU tier. New-duct $200 is extra if ducts are replaced.

Detroit BSEED Fee Schedule – gas-fired installation permits and refrigerating systems Retrieved Sep 1, 2026.

Deck

Fee basis: Based on project value.

Project value for the formula: low $8,000, typical $12,000, high $19,200.

Detroit BSEED Fee Schedule (effective Jan 1, 2024, modified July 18, 2025): New Buildings, Alterations, Repairs, And Additions (source retrieved Oct 7, 2026), under Building/Residential Inspection and Plan Review. The official typical path is the building/residential permit band over $2,000 but not over $25,000: base $271.43 for the first $2,000 plus $34.09 per $1,000 or fraction thereof over $2,000.

The fee is based on the project valuation. A permit is required on that typical path.

The low fee is $475.97, the typical fee is $612.33, and the high fee is $885.05. The official typical project value is $12,000.

Listed assumed valuations are $8,000 low, $12,000 typical, and $19,200 high; $19,200 is the top of the published 16×20 (320 sf) deck table of $12,800 to $19,200. All three valuations sit in the $2,001 to $25,000 band.

  • Low $8,000: 6 additional thousands above $2,000, so $271.43 + $34.09 × 6 = $475.97, which is the low fee.
  • Typical $12,000: 10 additional thousands above $2,000, so $271.43 + $34.09 × 10 = $612.33, which is the typical fee.

The official extra named Building/residential permit is that same $612.33 and is not added again.

  • High $19,200: $17,200 above $2,000 is 17.2 thousands, and the or-fraction rule rounds that up to 18, so $271.43 + $34.09 × 18 = $885.05, which is the high fee.

The $885.05 high is not added on top of the $612.33 typical. The 35% Building, Structural, and Zoning Code Plan Review deposit is adjustable toward the full fee when the permit is procured, so it is credited, not added on top.

The 7% electrical, mechanical, and plumbing plan review lines are not added for a deck with no trade plans. Project cost uses the schedule's square-foot cost table or the contract.

No deck-height exemption appears in the BSEED fee PDF. This note does not invent a fee beyond the official $475.97, $612.33, and $885.05 totals.

No deck-height exemption in the BSEED fee PDF. Typical 16×20 uses assumed $12,000.

Detroit BSEED Fee Schedule (effective Jan 1, 2024, modified July 18, 2025): New Buildings, Alterations, Repairs, And Additions Retrieved Oct 7, 2026.

Kitchen remodel

Fee basis: Based on project value.

Project value for the formula: low $15,000, typical $35,000, high $75,000.

$15,000 building only $271.43+$34.09×13=$714.60. $35,000: $1,300.87 + 14% = $1,482.99. $75,000: $1,055.57+$24.53×50=$2,282.07 + 14% = $2,601.56.

35% building plan-review is a deposit toward the permit, not added. If E/P plan review is not required, drop the 14%. Cabinets-only may not need this path.

Detroit BSEED Fee Schedule – building permits and E/M/P 7% plan review Retrieved Sep 1, 2026.

Questions about these permit fees

How much is a roof replacement permit in Detroit?

The typical permit fee is $612.33. The range is $475.97 to $953.23. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $22,000. Source: City of Detroit BSEED Fee Schedule, effective Jan 1, 2024, modified July 18, 2025 – Building and Residential Permits. Retrieved Sep 1, 2026.

How much is an HVAC replacement permit in Detroit?

The typical permit fee is $272. The range is $142 to $301. Fee basis: Flat fee. Project value on this row: low $5,000, typical $7,500, high $16,000. Source: Detroit BSEED Fee Schedule – gas-fired installation permits and refrigerating systems. Retrieved Sep 1, 2026.

How much is a deck permit in Detroit?

The typical permit fee is $612.33. The range is $475.97 to $885.05. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $19,200. Source: Detroit BSEED Fee Schedule (effective Jan 1, 2024, modified July 18, 2025): New Buildings, Alterations, Repairs, And Additions. Retrieved Oct 7, 2026.

How much is a kitchen remodel permit in Detroit?

The typical permit fee is $1,483. The range is $714.60 to $2,602. Fee basis: Based on project value. Project value for the formula: low $15,000, typical $35,000, high $75,000. Source: Detroit BSEED Fee Schedule – building permits and E/M/P 7% plan review. Retrieved Sep 1, 2026.

Where do I apply for a building permit in Detroit?

Apply with Detroit Buildings, Safety Engineering and Environmental Department (BSEED). The permit portal is https://permits.detroitmi.gov.