Building Permit Fees in Albuquerque, NM (2026)

City of Albuquerque Planning Department, Building Safety Division is the permit office for Albuquerque, NM. The fee schedule year is 2024.

Updated Sep 1, 2026 · Fees checked Sep 1, 2026

Permit fees by job

Building permit fees in Albuquerque, NM by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $70

Flat fee. Project value on this row: low $8,000, typical $12,000, high $22,000.

Full roof replacement calculation below

City of Albuquerque 2024 Uniform Administrative Code Tables 112-A/C/G

Retrieved Sep 1, 2026

HVAC replacement

Typical $79

Range $63 to $103

Low one unit $47+$16=$63.0. Typical furnace+AC $47+$32=$79.0. High 5-ton new-install item 9 $40 + furnace $16 + admin $47=$103.0.

Full HVAC replacement calculation below

Albuquerque UAC Table 112-C Mechanical Permit Fees

Retrieved Sep 1, 2026

Deck

Typical $172.63

Range $126.43 to $265.03

$2,001 to $25,000: $69.25+$14 per extra $1,000, then ×0.50, plus 65% plan review. $8,000=126.43; $12,000=172.63; $19,200=265.03.

Full deck calculation below

City of Albuquerque 2024 Uniform Administrative Code Tables 112-A/C/G

Retrieved Sep 1, 2026

Kitchen remodel

Typical $406.52

Range $207.28 to $675.47

$15,000=207.28; $35,000=406.52; $75,000=675.47 (modifier 0.50 + 65% plan review).

Full kitchen remodel calculation below

City of Albuquerque 2024 Uniform Administrative Code Tables 112-A/C/G

Retrieved Sep 1, 2026

How each fee is calculated

Roof replacement

Fee basis: Flat fee.

Project value on this row: low $8,000, typical $12,000, high $22,000.

City of Albuquerque 2024 Uniform Administrative Code Tables 112-A/C/G (source retrieved Sep 1, 2026). The official typical path is a Table 112-G residential re-roof permit.

The fee is a flat amount. A permit is required on that typical path.

The low fee is $70, the typical fee is $70, and the high fee is $70. The official typical project value is $12,000.

Listed assumed valuations are $8,000 low, $12,000 typical, and $22,000 high. Valuation is not an input on this flat path, so those amounts are unused and do not change the $70 / $70 / $70 listed fees.

Table 112-G residential re-roof is Admin $30 + inspection $40. Modifier 1.0. $30 + $40 = $70.

  • Low $8,000: valuation is unused, so the low fee stays $70.

Table 112-G residential re-roof Admin $30 plus inspection $40 equals $70, so the low fee is $70. The low uses the same Table 112-G path as the typical.

Valuation does not change the flat fee.

  • Typical $12,000: valuation is unused, so the typical fee stays $70.

Table 112-G residential re-roof Admin $30 plus inspection $40 equals $70, so the typical fee is $70. The $30 admin and the $40 inspection are included in the $70 and are not added again.

  • High $22,000: valuation is unused, so the high fee stays $70.

The high uses the same Table 112-G path. Table 112-G residential re-roof Admin $30 plus inspection $40 equals $70, so the high fee is $70.

The $70 high is the same total as the $70 typical and is not added on top of it. All re-roofs require a permit (UAC 109.1).

Table 112-G is used instead of Table 112-A; 65% plan review applies to 112-A/112-E, not 112-G. The official Table 112-G extra line is $70 and matches the low fee, the typical fee, and the high fee.

The $70 / $70 / $70 band is the same Table 112-G residential re-roof path on low, typical, and high. Residential R-3 re-roof uses that Table 112-G line; it is not a Table 112-A valuation fee on this row.

This note does not invent a fee beyond the official $70 total.

All re-roofs require a permit (UAC 109.1). Table 112-G is used instead of Table 112-A; 65% plan review applies to 112-A/112-E, not 112-G.

City of Albuquerque 2024 Uniform Administrative Code Tables 112-A/C/G Retrieved Sep 1, 2026.

HVAC replacement

Fee basis: Flat fee.

Project value on this row: $7,500.

Low one unit $47+$16=$63. Typical furnace+AC $47+$32=$79.

  • High 5-ton new-install item 9 $40 + furnace $16 + admin $47=$103.

Like-for-like uses item 7 ($16 each) plus $47 admin, not the new-install condensing-unit tiers. Plan review 25% of mechanical is for plans; not added for a change-out.

Albuquerque UAC Table 112-C Mechanical Permit Fees Retrieved Sep 1, 2026.

Deck

Fee basis: Based on project value.

Project value for the formula: low $8,000, typical $12,000, high $19,200.

$2,001–$25,000: $69.25+$14 per extra $1,000, then ×0.50, plus 65% plan review. $8,000=126.43; $12,000=172.63; $19,200=265.03.

Platforms ≤30 in may be exempt (UAC 109.2.1(7)); typical 16×20 is treated as permitted. Cabinets-style finish exemption does not apply.

City of Albuquerque 2024 Uniform Administrative Code Tables 112-A/C/G Retrieved Sep 1, 2026.

Kitchen remodel

Fee basis: Based on project value.

Project value for the formula: low $15,000, typical $35,000, high $75,000.

$15,000=207.28; $35,000=406.52; $75,000=675.47 (modifier 0.50 + 65% plan review).

Cabinets/countertops-only are exempt (UAC 109.2.1(8)). Dataset kitchen is a permitted remodel.

City of Albuquerque 2024 Uniform Administrative Code Tables 112-A/C/G Retrieved Sep 1, 2026.

Questions about these permit fees

How much is a roof replacement permit in Albuquerque?

The typical permit fee is $70. Fee basis: Flat fee. Project value on this row: low $8,000, typical $12,000, high $22,000. Source: City of Albuquerque 2024 Uniform Administrative Code Tables 112-A/C/G. Retrieved Sep 1, 2026.

How much is an HVAC replacement permit in Albuquerque?

The typical permit fee is $79. The range is $63 to $103. Fee basis: Flat fee. Project value on this row: $7,500. Source: Albuquerque UAC Table 112-C Mechanical Permit Fees. Retrieved Sep 1, 2026.

How much is a deck permit in Albuquerque?

The typical permit fee is $172.63. The range is $126.43 to $265.03. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $19,200. Source: City of Albuquerque 2024 Uniform Administrative Code Tables 112-A/C/G. Retrieved Sep 1, 2026.

How much is a kitchen remodel permit in Albuquerque?

The typical permit fee is $406.52. The range is $207.28 to $675.47. Fee basis: Based on project value. Project value for the formula: low $15,000, typical $35,000, high $75,000. Source: City of Albuquerque 2024 Uniform Administrative Code Tables 112-A/C/G. Retrieved Sep 1, 2026.

Where do I apply for a building permit in Albuquerque?

Apply with City of Albuquerque Planning Department, Building Safety Division. The permit portal is https://www.cabq.gov/planning/building-safety-division.

Permit fees in other cities in the West