Permit fees by job

Building permit fees in Salt Lake City, UT by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $315.97

Range $235.97 to $515.97

Typical $12,000: $115.97 first $2,000 + $20×10 = $315.97. Low $8,000 = $235.97. High $22,000 = $515.97. Documented 1,000/1,500/1,800 sf does not change this valuation table.

Full roof replacement calculation below

Salt Lake City Consolidated Fee Schedule (Ord. 2026-29, amended 06/16/2026) and mechanical fee form (updated 7/2026)

Retrieved Sep 1, 2026

HVAC replacement

Typical $114.13

Range $89.89 to $132.31

Typical 3-ton (36,000 BTU) like-for-like split = $59 + furnace $30 + compressor/AC $24 = $113.00 × 1.01 = $114.13. Low = furnace only $89.00 × 1.01 = $89.89. High = typical + vent $18 = $131.00 × 1.01 = $132.31.

Full HVAC replacement calculation below

Salt Lake City Mechanical Fee Schedule (updated 7/2026): base $59 plus chart plus 1% state fee

Retrieved Sep 1, 2026

Deck

Typical $521.35

Range $389.35 to $785.35

Typical $12,000: building $315.97 + 65% plan review $205.38 = $521.35. Low $8,000: $235.97 × 1.65 = $389.35. High $19,200: $115.97 + $20×18 = $475.97 × 1.65 = $785.35. Typical-job spec 16×20 = 320 sf.

Full deck calculation below

Salt Lake City Consolidated Fee Schedule (Ord. 2026-29, amended 06/16/2026) and mechanical fee form (updated 7/2026)

Retrieved Sep 1, 2026

Kitchen remodel

Typical $1,181

Range $620.35 to $1,940

Typical $35,000: $575.97 first $25,000 + $14×10 = $715.97 × 1.65 = $1,181.35. Low $15,000: $375.97 × 1.65 = $620.35. High $75,000: $925.97 + $10×25 = $1,175.97 × 1.65 = $1,940.35. Typical-job spec 200 sf.

Full kitchen remodel calculation below

Salt Lake City Consolidated Fee Schedule (Ord. 2026-29, amended 06/16/2026) and mechanical fee form (updated 7/2026)

Retrieved Sep 1, 2026

How each fee is calculated

Roof replacement

Fee basis: Based on project value.

Project value for the formula: low $8,000, typical $12,000, high $22,000.

  • Typical $12,000: $115.97 first $2,000 + $20×10 = $315.97.
  • Low $8,000 = $235.97.
  • High $22,000 = $515.97.

Documented 1,000/1,500/1,800 sf does not change this valuation table.

City of Salt Lake City, not Salt Lake County unincorporated. Building valuation table from the official CFS. Plan review 65% is not applied to like-for-like covering reroof.

Salt Lake City Consolidated Fee Schedule (Ord. 2026-29, amended 06/16/2026) and mechanical fee form (updated 7/2026) Retrieved Sep 1, 2026.

HVAC replacement

Fee basis: Flat fee.

Project value on this row: $7,500.

  • Typical 3-ton (36,000 BTU) like-for-like split = $59 + furnace $30 + compressor/AC $24 = $113.00 × 1.01 = $114.13.

Low = furnace only $89.00 × 1.01 = $89.89. High = typical + vent $18 = $131.00 × 1.01 = $132.31.

City of Salt Lake City. Mechanical base $59 plus equipment chart plus 1% Utah state fee. Furnace ≤200,000 BTU is $30. Compressor/AC/heat-pump table lists $24 as the first amount under that heading and separately lists 1.5–4 hp or tons (3-ton is in that size band). Electrical not added.

Salt Lake City Mechanical Fee Schedule (updated 7/2026): base $59 plus chart plus 1% state fee Retrieved Sep 1, 2026.

Deck

Fee basis: Based on project value.

Project value for the formula: low $8,000, typical $12,000, high $19,200.

  • Typical $12,000: building $315.97 + 65% plan review $205.38 = $521.35.
  • Low $8,000: $235.97 × 1.65 = $389.35.
  • High $19,200: $115.97 + $20×18 = $475.97 × 1.65 = $785.35.

Typical-job spec 16×20 = 320 sf.

City of Salt Lake City. Decks use the building valuation table plus 65% plan review. Ground-level decks that do not need a building permit are not assumed.

Salt Lake City Consolidated Fee Schedule (Ord. 2026-29, amended 06/16/2026) and mechanical fee form (updated 7/2026) Retrieved Sep 1, 2026.

Kitchen remodel

Fee basis: Based on project value.

Project value for the formula: low $15,000, typical $35,000, high $75,000.

  • Typical $35,000: $575.97 first $25,000 + $14×10 = $715.97 × 1.65 = $1,181.35.
  • Low $15,000: $375.97 × 1.65 = $620.35.
  • High $75,000: $925.97 + $10×25 = $1,175.97 × 1.65 = $1,940.35.

Typical-job spec 200 sf.

Kitchen remodel on the building valuation table plus 65% plan review. Plumbing/electrical are separate and are not added. Cosmetic cabinet-only work may not need a building permit.

Salt Lake City Consolidated Fee Schedule (Ord. 2026-29, amended 06/16/2026) and mechanical fee form (updated 7/2026) Retrieved Sep 1, 2026.

Questions about these permit fees

How much is a roof replacement permit in Salt Lake City?

The typical permit fee is $315.97. The range is $235.97 to $515.97. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $22,000. Source: Salt Lake City Consolidated Fee Schedule (Ord. 2026-29, amended 06/16/2026) and mechanical fee form (updated 7/2026). Retrieved Sep 1, 2026.

How much is an HVAC replacement permit in Salt Lake City?

The typical permit fee is $114.13. The range is $89.89 to $132.31. Fee basis: Flat fee. Project value on this row: $7,500. Source: Salt Lake City Mechanical Fee Schedule (updated 7/2026): base $59 plus chart plus 1% state fee. Retrieved Sep 1, 2026.

How much is a deck permit in Salt Lake City?

The typical permit fee is $521.35. The range is $389.35 to $785.35. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $19,200. Source: Salt Lake City Consolidated Fee Schedule (Ord. 2026-29, amended 06/16/2026) and mechanical fee form (updated 7/2026). Retrieved Sep 1, 2026.

How much is a kitchen remodel permit in Salt Lake City?

The typical permit fee is $1,181. The range is $620.35 to $1,940. Fee basis: Based on project value. Project value for the formula: low $15,000, typical $35,000, high $75,000. Source: Salt Lake City Consolidated Fee Schedule (Ord. 2026-29, amended 06/16/2026) and mechanical fee form (updated 7/2026). Retrieved Sep 1, 2026.

Where do I apply for a building permit in Salt Lake City?

Apply with Salt Lake City Building Services. The permit portal is https://slcpermits.com.