Building Permit Fees in Rochester, NY (2026)

City of Rochester Neighborhood and Business Development, Bureau of Zoning and Permitting is the permit office for Rochester, NY. The fee schedule year is 2026.

Updated Sep 1, 2026 ยท Fees checked Sep 1, 2026

Permit fees by job

Building permit fees in Rochester, NY by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $235

Range $175 to $395

Based on project value. Project value for the formula: low $8,000, typical $12,000, high $22,000.

Full roof replacement calculation below

City of Rochester building permit fees (changed effective July 1, 2026)

Retrieved Sep 1, 2026

HVAC replacement

Typical $0, no permit

The typical path does not require a permit.

Typical/low/high 3-ton (36,000 BTU) like-for-like split = $0 documented like-kind path.

Full HVAC replacement calculation below

City of Rochester when a permit is and isn't required (HVAC / appliances)

Retrieved Sep 1, 2026

Deck

Typical $160

Typical 16x20 = 320 sf: $160.00. Low 200 sf and high 400 sf stay in 145-400 sf = $160.00.

Full deck calculation below

City of Rochester building permit fees (changed effective July 1, 2026)

Retrieved Sep 1, 2026

Kitchen remodel

Typical $610

Range $300 to $1,285

Typical assumed $35,000: $34,001 to $36,000 = $610.00. Low $15,000 ($14,001 to $16,000) = $300.00. High $75,000 = $235 + 0.014 x 75,000 = $1285.00.

Full kitchen remodel calculation below

City of Rochester building permit fees (changed effective July 1, 2026)

Retrieved Sep 1, 2026

How each fee is calculated

Roof replacement

Fee basis: Based on project value.

Project value for the formula: low $8,000, typical $12,000, high $22,000.

City of Rochester building permit fees (changed effective July 1, 2026), retrieved Sep 1, 2026. These totals are for the City of Rochester, NY (Monroe County), not NYC and not Buffalo, and not Monroe County suburbs.

For complete tear-offs on structures containing conditioned space, a permit is required. Fees are the July 1, 2026 cost-of-work table.

The official fee band is $175 low, $235 typical, and $395 high. The official typical project value is $12,000.

Listed assumed job costs are $8,000 low, $12,000 typical, and $22,000 high. The building permit is a bracket table by actual cost of work, in $2,000 steps.

There is no percentage formula. Job cost (the actual cost of work), not roof area, picks the bracket.

Use the full contract price as that cost of work. The fee rises with each $2,000 bracket of cost of work.

The steps are not one fixed dollar amount from one bracket to the next. The exact figure for any other job value is on the City of Rochester table.

This page records only the three brackets that match the assumed job costs. Walk the typical first.

At $12,000 the job falls in the $10,001-$12,000 bracket, and that bracket is $235.00, so the typical fee is $235.00. The only listed permit line at that typical is the building permit based on actual cost of work at $235.00 (included; $10,001-$12,000 = $235).

  • Low $8,000 falls in the $6,001-$8,000 bracket, and that bracket is $175.00, so the low fee is $175.00.
  • High $22,000 falls in the $20,001-$22,000 bracket, and that bracket is $395.00, so the high fee is $395.00.

The $395.00 high is not added on top of the $235.00 typical. The $175.00 low is the same building permit at another bracket, not a second charge.

No other permit lines are listed. There is no extra listed line beyond the building permit.

Documented roof size, including 1,000 / 1,500 / 1,800 sf of roof surface, does not pick the bracket and does not change those fees. This note does not invent a fee beyond the official $175, $235, and $395 totals.

City of Rochester, NY (Monroe), not NYC and not Buffalo. A permit is required for complete tear-offs on structures containing conditioned space. Fees are the July 1, 2026 cost-of-work table.

City of Rochester building permit fees (changed effective July 1, 2026) Retrieved Sep 1, 2026.

HVAC replacement

Fee basis: Often exempt.

Project value on this row: $7,500.

Typical/low/high 3-ton (36,000 BTU) like-for-like split = $0 documented like-kind path.

City of Rochester. Official permits page: a permit is required for new installations or replacement of HVAC systems that are not like-kind replacements. Typical 3-ton like-for-like split is the documented like-kind path and does not require that permit. Non-like-kind equipment would use the cost-of-work building table or the $100 AC/heat-pump electrical inspection line and is not this typical.

City of Rochester when a permit is and isn't required (HVAC / appliances) Retrieved Sep 1, 2026.

Deck

Fee basis: Flat fee.

Project value on this row: low $8,000, typical $12,000, high $19,200.

  • Typical 16x20 = 320 sf: $160.00.
  • Low 200 sf and high 400 sf stay in 145-400 sf = $160.00.

City of Rochester. Deck fees: up to 144 sf $75; 145-400 sf $160; over 400 sf $235. Typical 16x20=320 sf and the 200/400 sf specs all sit in 145-400. A permit is not required for decks less than 18 inches above grade.

City of Rochester building permit fees (changed effective July 1, 2026) Retrieved Sep 1, 2026.

Kitchen remodel

Fee basis: Based on project value.

Project value for the formula: low $15,000, typical $35,000, high $75,000.

Typical assumed $35,000: $34,001-$36,000 = $610.00.

  • Low $15,000 ($14,001-$16,000) = $300.00.
  • High $75,000 = $235 + 0.014 x 75,000 = $1,285.00.

City of Rochester. Kitchen remodel uses the July 1, 2026 cost-of-work building table. Plumbing fixture fees are a separate schedule and are not stacked.

City of Rochester building permit fees (changed effective July 1, 2026) Retrieved Sep 1, 2026.

Questions about these permit fees

How much is a roof replacement permit in Rochester?

The typical permit fee is $235. The range is $175 to $395. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $22,000. Source: City of Rochester building permit fees (changed effective July 1, 2026). Retrieved Sep 1, 2026.

How much is an HVAC replacement permit in Rochester?

The typical permit fee is $0, no permit. The typical path does not require a permit. Fee basis: Often exempt. Project value on this row: $7,500. Source: City of Rochester when a permit is and isn't required (HVAC / appliances). Retrieved Sep 1, 2026.

Do I need a permit for an HVAC replacement in Rochester?

No. The typical path does not require a permit. Fee basis: Often exempt. City of Rochester. Official permits page: a permit is required for new installations or replacement of HVAC systems that are not like-kind replacements. Typical 3-ton like-for-like split is the documented like-kind path and does not require that permit. Non-like-kind equipment would use the cost-of-work building table or the $100 AC/heat-pump electrical inspection line and is not this typical.

How much is a deck permit in Rochester?

The typical permit fee is $160. Fee basis: Flat fee. Project value on this row: low $8,000, typical $12,000, high $19,200. Source: City of Rochester building permit fees (changed effective July 1, 2026). Retrieved Sep 1, 2026.

How much is a kitchen remodel permit in Rochester?

The typical permit fee is $610. The range is $300 to $1,285. Fee basis: Based on project value. Project value for the formula: low $15,000, typical $35,000, high $75,000. Source: City of Rochester building permit fees (changed effective July 1, 2026). Retrieved Sep 1, 2026.

Where do I apply for a building permit in Rochester?

Apply with City of Rochester Neighborhood and Business Development, Bureau of Zoning and Permitting. The permit portal is https://www.cityofrochester.gov/departments/neighborhood-and-business-development/building-permits.