Building Permit Fees in Providence, RI (2026)

City of Providence Department of Inspection and Standards is the permit office for Providence, RI. The fee schedule year is 2018.

Updated Sep 1, 2026 ยท Fees checked Sep 1, 2026

Permit fees by job

Building permit fees in Providence, RI by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $296

Range $200 to $526

Typical $12,000: table $272.00 + levy $24.00 = $296.00. Low $8,000 = $200.00. High $22,000 = $526.00.

Full roof replacement calculation below

510-RICR-00-00-21.12 City of Providence building-permit fee schedule (current on RI SOS); city FAQ reprints the same table

Retrieved Sep 1, 2026

HVAC replacement

Typical $187.50

Range $135 to $388

Typical $7,500: table $172.50 + levy $15.00 = $187.50. Low $5,000 = $135.00. High $16,000 = $388.00.

Full HVAC replacement calculation below

510-RICR-00-00-21.12 City of Providence building-permit fee schedule (current on RI SOS); city FAQ reprints the same table

Retrieved Sep 1, 2026

Deck

Typical $296

Range $200 to $461.60

Typical $12,000: table $272.00 + levy $24.00 = $296.00. Low $8,000 = $200.00. High $19,200 = $461.60.

Full deck calculation below

510-RICR-00-00-21.12 City of Providence building-permit fee schedule (current on RI SOS); city FAQ reprints the same table

Retrieved Sep 1, 2026

Kitchen remodel

Typical $825

Range $365 to $1,645

Typical $35,000: table $755.00 + levy $70.00 = $825.00. Low $15,000 = $365.00. High $75,000 = $1645.00.

Full kitchen remodel calculation below

510-RICR-00-00-21.12 City of Providence building-permit fee schedule (current on RI SOS); city FAQ reprints the same table

Retrieved Sep 1, 2026

How each fee is calculated

Roof replacement

Fee basis: Based on project value.

Project value for the formula: low $8,000, typical $12,000, high $22,000.

  • Typical $12,000: table $272.00 + levy $24.00 = $296.00.
  • Low $8,000 = $200.00.
  • High $22,000 = $526.00.

City of Providence, not other RI cities. Table is the official City of Providence schedule in 510-RICR-00-00-21.12 (still posted on rules.sos.ri.gov). City FAQ (2020) reprints the same $23/$21/$19 brackets; RICR minimum $125 is used, not the FAQ $50 minimum. HVAC uses the same construction-cost table (no separate mechanical dollar table was published). Levy 0.2% (max $100 on 1-4 family) is added because RICR says the table is exclusive of that levy.

510-RICR-00-00-21.12 City of Providence building-permit fee schedule (current on RI SOS); city FAQ reprints the same table Retrieved Sep 1, 2026.

HVAC replacement

Fee basis: Based on project value.

Project value for the formula: low $5,000, typical $7,500, high $16,000.

  • Typical $7,500: table $172.50 + levy $15.00 = $187.50.
  • Low $5,000 = $135.00.
  • High $16,000 = $388.00.

City of Providence, not other RI cities. Table is the official City of Providence schedule in 510-RICR-00-00-21.12 (still posted on rules.sos.ri.gov). City FAQ (2020) reprints the same $23/$21/$19 brackets; RICR minimum $125 is used, not the FAQ $50 minimum. HVAC uses the same construction-cost table (no separate mechanical dollar table was published). Levy 0.2% (max $100 on 1-4 family) is added because RICR says the table is exclusive of that levy.

510-RICR-00-00-21.12 City of Providence building-permit fee schedule (current on RI SOS); city FAQ reprints the same table Retrieved Sep 1, 2026.

Deck

Fee basis: Based on project value.

Project value for the formula: low $8,000, typical $12,000, high $19,200.

  • Typical $12,000: table $272.00 + levy $24.00 = $296.00.
  • Low $8,000 = $200.00.
  • High $19,200 = $461.60.

City of Providence, not other RI cities. Table is the official City of Providence schedule in 510-RICR-00-00-21.12 (still posted on rules.sos.ri.gov). City FAQ (2020) reprints the same $23/$21/$19 brackets; RICR minimum $125 is used, not the FAQ $50 minimum. HVAC uses the same construction-cost table (no separate mechanical dollar table was published). Levy 0.2% (max $100 on 1-4 family) is added because RICR says the table is exclusive of that levy.

510-RICR-00-00-21.12 City of Providence building-permit fee schedule (current on RI SOS); city FAQ reprints the same table Retrieved Sep 1, 2026.

Kitchen remodel

Fee basis: Based on project value.

Project value for the formula: low $15,000, typical $35,000, high $75,000.

  • Typical $35,000: table $755.00 + levy $70.00 = $825.00.
  • Low $15,000 = $365.00.
  • High $75,000 = $1,645.00.

City of Providence, not other RI cities. Table is the official City of Providence schedule in 510-RICR-00-00-21.12 (still posted on rules.sos.ri.gov). City FAQ (2020) reprints the same $23/$21/$19 brackets; RICR minimum $125 is used, not the FAQ $50 minimum. HVAC uses the same construction-cost table (no separate mechanical dollar table was published). Levy 0.2% (max $100 on 1-4 family) is added because RICR says the table is exclusive of that levy.

510-RICR-00-00-21.12 City of Providence building-permit fee schedule (current on RI SOS); city FAQ reprints the same table Retrieved Sep 1, 2026.

Questions about these permit fees

How much is a roof replacement permit in Providence?

The typical permit fee is $296. The range is $200 to $526. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $22,000. Source: 510-RICR-00-00-21.12 City of Providence building-permit fee schedule (current on RI SOS); city FAQ reprints the same table. Retrieved Sep 1, 2026.

How much is an HVAC replacement permit in Providence?

The typical permit fee is $187.50. The range is $135 to $388. Fee basis: Based on project value. Project value for the formula: low $5,000, typical $7,500, high $16,000. Source: 510-RICR-00-00-21.12 City of Providence building-permit fee schedule (current on RI SOS); city FAQ reprints the same table. Retrieved Sep 1, 2026.

How much is a deck permit in Providence?

The typical permit fee is $296. The range is $200 to $461.60. Fee basis: Based on project value. Project value for the formula: low $8,000, typical $12,000, high $19,200. Source: 510-RICR-00-00-21.12 City of Providence building-permit fee schedule (current on RI SOS); city FAQ reprints the same table. Retrieved Sep 1, 2026.

How much is a kitchen remodel permit in Providence?

The typical permit fee is $825. The range is $365 to $1,645. Fee basis: Based on project value. Project value for the formula: low $15,000, typical $35,000, high $75,000. Source: 510-RICR-00-00-21.12 City of Providence building-permit fee schedule (current on RI SOS); city FAQ reprints the same table. Retrieved Sep 1, 2026.

Where do I apply for a building permit in Providence?

Apply with City of Providence Department of Inspection and Standards. The permit portal is https://www.providenceri.gov/inspection-standards/.