Roof replacement
Fee basis: Based on project value.
Project value for the formula: low $8,000, typical $12,000, high $22,000.
City of Minneapolis Building Permit Fee Schedule (Smartsheet published on the official building-fees page; city page last updated Feb 27, 2026) (source retrieved Aug 29, 2026). The $2,001–$25,000 band is $104.20 for the first $2,000 plus $20.60 each additional $1,000 or fraction.
Plan review is 65% of the building permit fee. The Minnesota state surcharge is value of work × 0.0005.
The official valuations of $8,000, $12,000, and $22,000 are all in that band, and each is an exact thousand above $2,000, so no fractional thousand is added. The minimum city building fee of $84.20 excluding the surcharge is not binding because each building-permit line is higher.
- Low $8,000: 6 additional thousands, so $104.20 + $20.60 × 6 = $227.80.
Plan review is 65% × $227.80 = $148.07. The surcharge is $8,000 × 0.0005 = $4.00.
Then $227.80 + $148.07 + $4.00 = $379.87, which is the low fee of $379.87.
- Typical $12,000: 10 additional thousands, so $104.20 + $20.60 × 10 = $310.20.
Plan review is 65% × $310.20 = $201.63. The surcharge is $12,000 × 0.0005 = $6.00.
Then $310.20 + $201.63 + $6.00 = $517.83, which is the typical fee of $517.83. The official typical project value is $12,000.
- High $22,000: 20 additional thousands, so $104.20 + $20.60 × 20 = $516.20.
Plan review is 65% × $516.20 = $335.53. The surcharge is $22,000 × 0.0005 = $11.00.
Then $516.20 + $335.53 + $11.00 = $862.73, which is the high fee of $862.73. Like-for-like shingle reroofs historically skipped city plan review on older worksheets.
The Feb 2026 published formula does not list that exception, so 65% plan review is included. Listed assumed valuations are $8,000, $12,000, and $22,000.
Computed from the city's current valuation table plus 65% plan review plus the 0.0005 Minnesota state surcharge. The minimum city building fee is $84.20 excluding the surcharge. Like-for-like shingle reroofs historically skipped city plan review on older worksheets. The Feb 2026 published formula does not list that exception, so 65% plan review is included. Confirm with Minneapolis Development Review.
City of Minneapolis Building Permit Fee Schedule (Smartsheet published on the official building-fees page; city page last updated Feb 27, 2026) Retrieved Aug 29, 2026.