Building Permit Fees in Atlanta, GA (2026)

Department of City Planning, Office of Buildings is the permit office for Atlanta, GA. The fee schedule year is 2026.

Updated Oct 18, 2026 · Fees checked Oct 18, 2026

Permit fees by job

Building permit fees in Atlanta, GA by job, 2026
JobPermit feeHow it is calculatedOfficial source
Roof replacement

Typical $175

Range from $175

Not listed yet.

Full roof replacement calculation below

City of Atlanta ATL311 – Residential construction permits (Office of Buildings)

Retrieved Oct 18, 2026

HVAC replacement

Typical $175

Range from $175

Not listed yet.

Full HVAC replacement calculation below

City of Atlanta ATL311 – Residential construction permits (Office of Buildings)

Retrieved Oct 18, 2026

Deck

Typical $175

Range from $175

Not listed yet.

Full deck calculation below

City of Atlanta ATL311 – Residential construction permits (Office of Buildings)

Retrieved Oct 18, 2026

Kitchen remodel

Typical $175

Range from $175

Not listed yet.

Full kitchen remodel calculation below

City of Atlanta ATL311 – Residential construction permits (Office of Buildings)

Retrieved Oct 18, 2026

How each fee is calculated

Roof replacement

Fee basis: Not listed yet.

Published city minimum: permit $150 + technology fee $25 = $175. That sum is the official low fee and the official typical fee for a roof replacement in Atlanta: the low fee of $175 and the typical fee of $175.

The extra named Minimum permit fee is $150 and is included at low and typical. The extra named Technology fee is a flat $25 included at low and typical; it is part of the published $175 floor (ATL311), and the same $25 applies at both listed bands.

Those two lines are the official $175. They come from the City of Atlanta ATL311 residential construction permits knowledge article (Office of Buildings), KB0012509, modified May 20, 2026.

This row names the source as City of Atlanta ATL311, Residential construction permits (Office of Buildings), at atl311.com, retrieved Oct 18, 2026. The Office of Buildings issues this residential permit via ATL311.

Office of Buildings residential permit required for reroof in typical cases. A permit is required, and the fee model on this row is unknown.

Low and typical are the same dollar amount because only the published city minimum ($150 + $25 tech = $175) is cited for both bands. No assumed project value is listed on this row, so the $175 floor is not computed from a valuation formula.

No assumed project value is listed. No high fee is shown because no official high above the published city minimum was extracted from ATL311, and the full Code of Ordinances Part 19 valuation table is not published in the fee schedule.

For a larger or higher-valuation reroof, check with ATL311 and the Office of Buildings whether a valuation-based amount above the published minimum applies; this row leaves that amount blank. Alternate path not used in listed totals: valuation-based fees above the published minimum may apply under Code of Ordinances Part 19, but a complete extractable fee table was not obtained, so amounts above $175 are not listed and are not included in totals.

The extra named Valuation-based fee above the published minimum (Code of Ordinances Part 19) has no published amount and is not included in the totals. Before filing, confirm current fees with ATL311 and the Office of Buildings.

Office of Buildings residential permit required for reroof in typical cases (Department of City Planning, Office of Buildings / ATL311). Only the published city minimum ($150 + $25 tech = $175) is cited for low and typical; no high fee is shown because the full Code of Ordinances Part 19 valuation table is not published in the fee schedule.

City of Atlanta ATL311 – Residential construction permits (Office of Buildings) Retrieved Oct 18, 2026.

HVAC replacement

Fee basis: Not listed yet.

Published city minimum: permit $150 + technology fee $25 = $175. That sum is the official low fee and the official typical fee for an HVAC replacement in Atlanta.

The $150 minimum permit fee is included at low and typical. The technology fee is a flat $25 included at low and typical; it is part of the published $175 floor, and the same $25 applies at both listed bands.

Those lines come from the City of Atlanta ATL311 residential construction permits knowledge article (Office of Buildings), modified May 20, 2026. This row names the source as City of Atlanta ATL311, Residential construction permits (Office of Buildings), at atl311.com, retrieved Oct 18, 2026.

Low and typical are the same dollar amount because only that published city minimum ($150 + $25 tech = $175) is cited for both bands. The caveat says only the published city minimum is cited for low and typical, so the official bands match.

No high fee is shown because no official high above the published city minimum was extracted from ATL311. The caveat states why no high fee is shown: the trade-specific schedule and the full Code of Ordinances Part 19 valuation table are not published in the fee schedule.

No assumed project valuation is listed on this row. No project value is listed, so the $175 is a published floor, not a formula output from an assumed valuation.

The official requirement, mechanical permit required per ATL311, comes from the Department of City Planning, Office of Buildings. Alternate path not used in listed totals: valuation-based or trade-specific fees above the published minimum may apply under Code of Ordinances Part 19, but that schedule is not published in the fee schedule, so amounts above $175 are not listed.

The extra named Valuation-based / trade-specific fee above the published minimum (Code of Ordinances Part 19) has no published amount and is not included in the totals. Before filing, check ATL311, the city fee schedule, and Office of Buildings mechanical fees via ATL311, and confirm the amount that applies to your job.

Mechanical permit required (Department of City Planning, Office of Buildings / ATL311). Only the published city minimum ($150 + $25 tech = $175) is cited for low and typical; no high fee is shown because the trade-specific schedule and full Code of Ordinances Part 19 valuation table are not published in the fee schedule.

City of Atlanta ATL311 – Residential construction permits (Office of Buildings) Retrieved Oct 18, 2026.

Deck

Fee basis: Not listed yet.

Published city minimum: permit $150 + technology fee $25 = $175. That sum is the official low fee and the official typical fee for a deck in Atlanta.

The extra named Minimum permit fee is $150 and is included at low and typical. The extra named Technology fee is a flat $25 included at low and typical; it is part of the published $175 floor, and the same $25 applies at both listed bands.

Those lines come from the City of Atlanta ATL311 residential construction permits knowledge article (Office of Buildings), modified May 20, 2026. ATL311 lists deck/patio addition as a residential permit type.

This row names the source as City of Atlanta ATL311, Residential construction permits (Office of Buildings), at atl311.com, retrieved Oct 18, 2026. A permit is required, and the fee model on this row is unknown.

Low and typical are the same dollar amount because only that published city minimum ($150 + $25 tech = $175) is cited for both bands. No high fee is shown because no official high above the published city minimum was extracted from ATL311.

The caveat states why no high fee is shown: the full Code of Ordinances Part 19 valuation table is not published in the fee schedule. No project value is listed, so the $175 is a published floor, not a formula output from an assumed valuation.

The official requirement comes from the Department of City Planning, Office of Buildings. Alternate path not used in listed totals: valuation-based fees above the published minimum may apply under Code of Ordinances Part 19, but a complete extractable fee table was not obtained, so amounts above $175 are not listed and are not included in totals.

The extra named Valuation-based fee above the published minimum (Code of Ordinances Part 19) has no published amount and is not included in the totals. Budget the official $175 low and typical line, and verify anything above that floor with the city.

Before filing, confirm current fees with ATL311 and the Office of Buildings, including deck-patio fees via ATL311 and the city fee schedule.

ATL311 lists deck/patio addition as a residential permit type (Department of City Planning, Office of Buildings / ATL311). Only the published city minimum ($150 + $25 tech = $175) is cited for low and typical; no high fee is shown because the full Code of Ordinances Part 19 valuation table is not published in the fee schedule.

City of Atlanta ATL311 – Residential construction permits (Office of Buildings) Retrieved Oct 18, 2026.

Kitchen remodel

Fee basis: Not listed yet.

Published city minimum: permit $150 + technology fee $25 = $175. That sum is the official low fee and the official typical fee for a kitchen remodel in Atlanta.

The extra named Minimum permit fee is $150 and is included at low and typical. The extra named Technology fee is a flat $25 included at low and typical; it is part of the published $175 floor, and the same $25 applies at both listed bands.

Those lines come from the City of Atlanta ATL311 residential construction permits knowledge article (Office of Buildings), modified May 20, 2026. ATL311 lists interior alterations as a residential permit type; cosmetic cabinet-only may be exempt.

The caveat states cosmetic cabinet-only same-layout work may be exempt. This row names the source as City of Atlanta ATL311, Residential construction permits (Office of Buildings), at atl311.com, retrieved Oct 18, 2026.

A permit is required, and the fee model on this row is unknown. Low and typical are the same dollar amount because only that published city minimum ($150 + $25 tech = $175) is cited for both bands.

No high fee is shown because no official high above the published city minimum was extracted from ATL311. The caveat states why no high fee is shown: the full Code of Ordinances Part 19 valuation table is not published in the fee schedule.

No project value is listed, so the $175 is a published floor, not a formula output from an assumed valuation. The official requirement comes from the Department of City Planning, Office of Buildings.

Alternate path not used in listed totals: valuation-based fees above the published minimum may apply under Code of Ordinances Part 19, but a complete extractable fee table was not obtained, so amounts above $175 are not listed and are not included in totals. The extra named Valuation-based fee above the published minimum (Code of Ordinances Part 19) has no published amount and is not included in the totals.

Before filing, confirm current Office of Buildings fees via ATL311 and the city fee schedule, including interior-alteration fees via ATL311.

Interior alterations are a listed residential permit type (Department of City Planning, Office of Buildings / ATL311). Cosmetic cabinet-only same-layout work may be exempt. Only the published city minimum ($150 + $25 tech = $175) is cited for low and typical; no high fee is shown because the full Code of Ordinances Part 19 valuation table is not published in the fee schedule.

City of Atlanta ATL311 – Residential construction permits (Office of Buildings) Retrieved Oct 18, 2026.

Questions about these permit fees

How much is a roof replacement permit in Atlanta?

The typical permit fee is $175. The range is from $175. Fee basis: Not listed yet. Source: City of Atlanta ATL311 – Residential construction permits (Office of Buildings). Retrieved Oct 18, 2026.

How much is an HVAC replacement permit in Atlanta?

The typical permit fee is $175. The range is from $175. Fee basis: Not listed yet. Source: City of Atlanta ATL311 – Residential construction permits (Office of Buildings). Retrieved Oct 18, 2026.

How much is a deck permit in Atlanta?

The typical permit fee is $175. The range is from $175. Fee basis: Not listed yet. Source: City of Atlanta ATL311 – Residential construction permits (Office of Buildings). Retrieved Oct 18, 2026.

How much is a kitchen remodel permit in Atlanta?

The typical permit fee is $175. The range is from $175. Fee basis: Not listed yet. Source: City of Atlanta ATL311 – Residential construction permits (Office of Buildings). Retrieved Oct 18, 2026.

Where do I apply for a building permit in Atlanta?

Apply with Department of City Planning, Office of Buildings. The permit portal is https://www.atlantaga.gov/government/departments/city-planning/office-of-buildings.